Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 017710 <br /> CLEANING <br /> PART1 GENERAL <br /> 1 . 01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental, and Special <br /> Conditions and other Division 1 specification sections apply to work of this section . <br /> 1 . 02 Description <br /> Cleaning shall be performed to maintain the building and site in a clean condition through out the <br /> duration of the project . The Contractor shall comply with all requirements for cleanliness described <br /> in other sections of these specifications . <br /> 1 . 03 The Contractor shall conduct daily inspections to ensure that the requirements for cleanliness are <br /> being met. <br /> PART 2 PRODUCTS <br /> 2 . 01 The Contractor shall provide all required manpower, material and equipment to maintain the <br /> standard of cleanliness as defined by the Owner. <br /> 2 . 02 Contractor shall use only those materials and equipment which are compatible with the surface being <br /> cleaned as recommended by the manufacturer or approved by the Designer. <br /> PART 3 EXECUTION <br /> 3 . 01 Progress Cleaning <br /> A . Stored items shall be kept in an orderly arrangement allowing maximum access and shall not <br /> impede drainage or traffic . <br /> Be Scrap, debris, waste material and other items shall not be allowed to accumulate on the roof. <br /> C . Contractor shall provide storage containers for all items awaiting removal from the site . <br /> Storage containers shall be approved by the Owner. Beat-up, unkempt Containers will not <br /> be allowed . Containers must be covered while not in use . <br /> 3 . 02 Contractor shall inspect all arrangements of materials stored on the project site on a weekly <br /> minimum basis and shall service all arrangements in accordance with the requirements of Paragraph <br /> 3 . 01 .A of this section . <br /> 3 . 03 Final Cleaning <br /> A. Except as specifically provided otherwise, " clean " shall be interpreted to mean the level of <br /> cleanliness generally attainable by skilled cleaners using commercially available building <br /> maintenance equipment and materials . <br /> Be All tools, equipment, materials, scrap, debris and waste shall be removed from the project <br /> site and a final progress cleaning conducted in accordance with this section . <br /> 09-26 Cleaning <br /> 01771061 <br />
The URL can be used to link to this page
Your browser does not support the video tag.