Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> 3 . Products and materials of other manufacturers $ Submit a written request for <br /> substitution stating manufacturer, product or material trade name, and product's or <br /> material ' s ability to meet or exceed the specifications . <br /> 1 . 06 Substitutions <br /> A . Should the Contractor desire to use products of other manufacturers than those specified, a <br /> written request shall be made to the Designer a minimum of seven days prior to the date for <br /> receiving bids . <br /> Be Substitutions of other, non-specified, products or materials shall be considered only when <br /> specified products or material become unavailable due to no fault of contractor and if the <br /> non-specified products or materials meet or exceed all criteria of the specified products . <br /> C . Contractor shall document each request with complete data substantiating compliance of <br /> proposed substitution with contract documents . <br /> D . Request for substitution constitutes a representation that Contractor : <br /> 1 . Has investigated proposed product or material and determined that it meets or <br /> exceeds , in all respects, specified product(s) . <br /> 2 . Shall provide the same warranty for the substitution as for specified product(s) <br /> and/or materials . <br /> 3 . Shall coordinate installation and make other changes which may be required for <br /> work to be complete in all respects . <br /> 4 . Waives claims for additional costs which may subsequently become apparent. <br /> E . Substitutions shall not be considered when they are indicated or implied on Shop Drawings <br /> or Product or Material Data submittals without separate written request, or when acceptance <br /> will require substantial revision of Contract Documents , <br /> F . Designer shall determine acceptability of proposed substitution and will notify Contractor of <br /> acceptance or rejection in writing within a reasonable time . <br /> G . Designer shall evaluate each substitution submittal for possible credit to the Owner . <br /> 1 . 07 Workmanship <br /> Work shall be performed by persons qualified and trained to install the specified products which will <br /> result in the workmanship and quality specified and to afford the manufacturer's guaranty. <br /> 1 . 08 Manufacturer's Instructions <br /> A . Work shall be performed in accordance with materials manufacturer's specifications and <br /> associated details submitted in accordance with Section 013300, Submittals unless otherwise <br /> noted . <br /> 09 -26 Product Requirements <br /> 16000 . 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.