Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 016000 <br /> PRODUCT REQUIREMENTS <br /> PART GENERAL <br /> 1 . 01 Related Documents <br /> Drawings and general provisions of the contract including General and Supplementary General <br /> Conditions and other Division 1 specification sections apply to work of this section . <br /> 1 . 02 Products <br /> A . Products include materials , equipment and systems . <br /> Be Furnish products of qualified manufacturers suitable for intended use . Furnish products <br /> of each type by single manufacturer unless specified otherwise . <br /> C . All materials must comply with specifications and referenced standards as minimum <br /> requirements . The latest edition of referenced standards shall apply unless specifically <br /> stated otherwise . <br /> D . Do not use materials and equipment removed from the existing structure, except as <br /> specifically required or allowed by contract documents . <br /> E . All materials and construction procedures used in the roofing work for this project shall <br /> comply with Factory Mutual Class I construction (FM 1-90A) , Underwriters Laboratory <br /> Class A, and State and Local standards and codes . Evidence of compliance with these <br /> provisions shall be provided in accordance with Section 013300 , Submittals . <br /> 1 . 03 Product Delivery <br /> A . Contractor shall be responsible for all aspects of material and equipment transportation, <br /> delivery, unloading, handling, storage, etc . necessary to get materials and equipment to the <br /> roof. <br /> Be Products shall be transported by methods to avoid product damage ; deliver all materials with <br /> manufacturer's labels intact and legible . <br /> C . Promptly inspect shipments to ensure products comply with requirements , quantities are <br /> correct, and products are undamaged . <br /> D . Contractor shall provide equipment and personnel to handle products by methods to prevent <br /> damage, soiling, or disfigurement. Damaged material shall be subject to rejection by the <br /> Owner or Designer. <br /> E . Arrange deliveries of materials in accordance with construction schedules and in ample time <br /> to facilitate inspection prior to installation . <br /> 09 -26 Product Requirements <br /> 16000 . 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.