Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> C . Remove temporary materials and construction at Substantial Completion . Repair existing <br /> facilities damaged by use, to original condition . <br /> D . Provide means of removing mud from vehicle wheels before entering street <br /> 2 . 10 Field Office <br /> The Contractor may provide a Field Office . The location shall be subject to the approval of the <br /> Owner . <br /> 2011 Plans, Specifications and Submittals <br /> Three copies of plans and specifications will be made available to the Contractor without cost. <br /> Additional copies may be acquired upon request. Cost of reproduction and handling of additional <br /> copies shall be borne by the Contractor . The Contractor shall be responsible for maintaining at least <br /> one current set of plans, specifications, reviewed submittals , and record drawings at the project site <br /> for the duration of construction . <br /> 2011 Ventilation <br /> A. Provide, as required, facilities to maintain specific storage conditions as described within this <br /> specification and as recommended by the materials manufacturer for use in construction . <br /> B . Provide adequate ventilation of enclosed areas to prevent the accumulation of fumes , vapors and <br /> gases . <br /> C . Take precautions and make provisions to protect Owner ' s facilities from intrusion of noxious <br /> odors into buildings from construction activities . <br /> PART 3 EXECUTION <br /> Not Used <br /> END OF SECTION <br /> 09 -26 Temporary Facilities and Controls <br /> 01500005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.