Orange County NC Website
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> C . Remove temporary materials and construction at Substantial Completion . Repair existing <br /> facilities damaged by use, to original condition . <br /> D . Provide means of removing mud from vehicle wheels before entering street <br /> 2 . 10 Field Office <br /> The Contractor may provide a Field Office . The location shall be subject to the approval of the <br /> Owner . <br /> 2011 Plans, Specifications and Submittals <br /> Three copies of plans and specifications will be made available to the Contractor without cost. <br /> Additional copies may be acquired upon request. Cost of reproduction and handling of additional <br /> copies shall be borne by the Contractor . The Contractor shall be responsible for maintaining at least <br /> one current set of plans, specifications, reviewed submittals , and record drawings at the project site <br /> for the duration of construction . <br /> 2011 Ventilation <br /> A. Provide, as required, facilities to maintain specific storage conditions as described within this <br /> specification and as recommended by the materials manufacturer for use in construction . <br /> B . Provide adequate ventilation of enclosed areas to prevent the accumulation of fumes , vapors and <br /> gases . <br /> C . Take precautions and make provisions to protect Owner ' s facilities from intrusion of noxious <br /> odors into buildings from construction activities . <br /> PART 3 EXECUTION <br /> Not Used <br /> END OF SECTION <br /> 09 -26 Temporary Facilities and Controls <br /> 01500005 <br />