Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 015000 <br /> TEMPORARY FACILITIES AND CONTROLS <br /> PART GENERAL <br /> 1 . 01 Related Documents <br /> Drawings and general provisions of the contract including General , Supplemental, and Special <br /> Conditions and other Division I specification sections apply to work of this section. <br /> 1 . 02 Description <br /> A . To provide for temporary facilities and controls required for the performance of the project . <br /> Such items include but are not necessarily limited to utilities such as heat, water, electricity <br /> telephone; sanitary facilities ; Contractor's facilities ; and enclosures such as tarpaulins , <br /> barricades and canopies . <br /> Be All equipment furnished by Contractor shall comply with all pertinent safety requirements . <br /> Co Ladders, scaffolding, planks, hoists, and all similar items furnished by individual trades in <br /> the execution of their own portions of the work are not a part of this section. <br /> 1903 Product Handling <br /> A . Contractor shall exercise all means necessary to maintain temporary facilities and controls in <br /> a proper and safe condition throughout the progress of the project. <br /> Be All required connections to existing utility systems shall be made with minimum disruption . <br /> If disruption of existing service is required, a minimum of 48 hours notice shall be given to <br /> the Owner and connections shall not be made without Owner's approval . If necessary, <br /> Contractor shall provide for alternate temporary service . <br /> Co If the required utility is not available from the Owner, the Contractor shall provide for <br /> alternate temporary service for the duration of the project . <br /> PART 2 PRODUCTS <br /> 2 . 01 All temporary facilities shall be subject to Owner's approval . <br /> A . Electricity <br /> 1 . The Owner shall furnish electricity required for construction at no cost to the <br /> Contractor. Contractor shall exercise measures to conserve energy. <br /> 2 . Access to "deminimus" 110 volt electricity by Contractor shall be designated by the <br /> Owner . <br /> 09 -26 Temporary Facilities and Controls <br /> 01500081 <br />
The URL can be used to link to this page
Your browser does not support the video tag.