Orange County NC Website
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> 1 . 04 Quality Control - Manufacturer <br /> A . The shingle manufacturer shall provide qualified technical (no sales) personnel to observe <br /> field conditions and material installation at start of field work . The Manufacturer's <br /> representative shall submit a written report(s) to the Designer and Owner listing <br /> observations and recommendations . The Roofing contractor shall be responsible for <br /> ensuring site visits by the shingle manufacturer 's representative(s) and shall notify the <br /> Owner, Owner ' s Representative, and Designer of any scheduled visits 48 hours in advance <br /> of visit . <br /> Be The Manufacturer's representative(s) shall certify that it has thoroughly reviewed the <br /> project with Contractor's field personnel . <br /> PART 2 PRODUCTS <br /> Not Used <br /> PART 3 EXECUTION <br /> Not Used <br /> END OF SECTION <br /> 09 -26 Quality Control <br /> 01400002 <br />