Orange County NC Website
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 014000 <br /> QUALITY CONTROL <br /> PART GENERAL <br /> 1 . 01 Related Documents <br /> Drawings and general provisions of the contract including General , Supplemental , Special <br /> Conditions and other Division 1 specification sections apply to work of this section . <br /> 1 . 02 Quality Control - Contractor <br /> A. Maintain quality control over products , services , site conditions, and workmanship , to <br /> produce work of specified quality. <br /> Be Provide safe access to the site and roof for inspection by the Owner or its authorized <br /> representative . <br /> C . Comply with industry standards except when more restrictive tolerances or specified <br /> requirements indicate more rigid standards or more precise workmanship . <br /> D . Perform work by persons qualified to produce workmanship of specified quality . <br /> E . Secure products in place with positive anchorage devices designed and sized to withstand <br /> stresses, vibration, and racking . <br /> 1 . 03 Quality Control - Owner <br /> A . The Owner reserves the right, at its discretion, to retain the services of an independent <br /> construction quality assurance representative to provide quality assurance of the work . <br /> Testing may be performed to determine any deficiencies in the roofing assembly. <br /> Be The cost of such services shall be borne by the Owner during the contract time . Any <br /> monitoring and testing required due to the installation being incomplete as a result of <br /> Contractor-controlled nonperformance shall be borne by the Contractor . <br /> C . The Contractor shall be required to notify the Owner or its designated representative prior <br /> to cancellation of any operations and subsequent restart of the project. Any cost resulting <br /> from the failure to notify shall be borne by the Contractor . <br /> D . Work found to be in violation of the specifications , or not in conformance with acceptable <br /> roofing standards , shall be subject to rejection including complete removal and replacement <br /> with new material at the Contractor's expense . <br /> E . The Designer shall document quantities of those materials bid on a unit price basis listed in <br /> the Form of Proposal as well as other materials . <br /> 09 -26 Quality Control <br /> 01400001 <br />