Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> I. Whenever a choice of color is available for a specified product, accurate color charts shall be <br /> submitted to the Designer for review and selection. <br /> 1 . 06 Manufacturer's Certificates <br /> A. Submit a statement from the manufacturer of the roof system bid stating that the roofing <br /> Contractor is an authorized applicator of the proposed roof system and, subject to the <br /> Owner's award of the construction contract, is authorized to install said system on this <br /> project. <br /> Be Submit a copy of the licensed applicator agreement. <br /> C . If any membrane components are not packaged by the membrane manufacturer, submit a <br /> letter from the membrane manufacturer clearly identifying the component and <br /> acknowledging approval to use the component on the project. <br /> 1 . 07 Samples <br /> A . Samples shall be of the exact item proposed to be furnished . <br /> Be Unless otherwise specified two samples of each item shall be submitted . <br /> C . Whenever a choice of color is available for a specified product, accurate color charts shall be <br /> submitted to the Designer for review and selection. <br /> 1 . 08 Personnel <br /> A. Within ten days of the award of contract, submit the names of superintendent and foreman, <br /> or foremen, proposed for this project. <br /> Be Superintendent named shall remain on the project for its entire duration . Written request <br /> to the Owner shall be required prior to replacement of superintendent. <br /> C . If non-English speaking workmen are employed, the foreman and superintendent shall <br /> be fluent in their language and in English . <br /> D . Superintendent shall be present during any progression of work. <br /> 1 . 09 Manufacturer Training <br /> Within seven days of the date of Notice to Proceed, submit a letter from the membrane manufacturer <br /> listing the names of those Contractor personnel who will be working on this project and are trained <br /> and qualified to install the system . <br /> 1 . 10 Insurance Certificates <br /> Submit insurance certificate issued to Owner by Contractor ' s insurance carrier listing all coverage ' s <br /> as specified in the Owner ' s General and Supplementary Conditions . <br /> 1 . 11 Permits <br /> Provide building permits required by federal, state, or local entity for the construction or demolition <br /> work required during the progress of the Work. If no permits are required, so state . <br /> 09 -26 Submittals <br /> 01330003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.