Orange County NC Website
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 013300 <br /> SUBMITTALS <br /> PART1 GENERAL <br /> 1 . 01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental, and Special <br /> Conditions and other Division 1 specification sections apply to work of this section . <br /> 1 . 02 Procedures <br /> A . Within seven calendar days after receipt of Notice to Proceed, the successful Contractor( s) <br /> shall submit the required information to the Designer in six copies . Three copies will be <br /> returned to the Contractor . <br /> Be Submit documents to the Designer with Submittal Form SF4 attached to document and <br /> sequentially numbered . Mark revised submittals with original number and sequential <br /> alphabetic suffix . <br /> C . All project submittals shall be forwarded to the Designer via a carrier that will guarantee <br /> delivery on the next working day. <br /> D . Each transmitted item shall identify the project ID#, name and Contractor. Material <br /> submittals shall also identify the type and trade name of material, material manufacturer, <br /> intended use, and specification number . Deviations from contract documents shall be <br /> identified . <br /> E . Shop drawings shall be made accurately to a scale sufficiently large to show all pertinent <br /> aspects of the item . <br /> F . All submittals shall bear the contractor's stamp, date and signature acknowledging review for <br /> compliance with specifications . <br /> G . After Designer's review of material, revise and resubmit, as required, identifying changes <br /> made since previous submittal . <br /> H. Distribute copies of reviewed submittals as appropriate . Instruct parties to promptly <br /> report inability to comply with requirements . <br /> I. Submittals not requested shall not be recognized or processed . <br /> 1 . 03 Pre -Job Damage Survey <br /> A . Contractor shall perform and submit a pre job damage survey of the rooftop <br /> equipment/features , building exterior, adjacent roof areas , adjacent site, pavements , and <br /> applicable building interior to document existing conditions prior to beginning work in <br /> accordance with Section 010100 , Summary of Work . <br /> 09 -26 Submittals <br /> 01330001 <br />