Orange County NC Website
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> 1 . 07 Contractor Use of Premises . <br /> A . Limit use of premises for construction operations to allow for Owner occupancy . <br /> Be Coordinate use of premises under direction of the Owner . <br /> Co The Contractor shall be held liable for any damages to the building, the building contents , <br /> or its occupancy resulting from work under this contract . <br /> D . The Contractor shall keep driveways and entrances serving the premises clear and <br /> available at all times . Do not use areas for vehicle parking or storage of materials or <br /> equipment . <br /> E . No tobacco product usage is permitted . <br /> F . Only the superintendent and foreman will be allowed in the building, unless during an <br /> emergency . <br /> G . There shall be no contact between workers and the occupants of the building . <br /> 1 . 08 Owner Occupancy $ <br /> Owner will occupy premises during entire period of construction to conduct normal operations . <br /> The Contractor shall cooperate with Owner to minimize conflict, and to facilitate Owner' s <br /> operations . <br /> 1 . 09 Coordination . <br /> A . Coordinate work of the various sections of specifications to assure efficient and orderly <br /> sequence of installation of materials . <br /> Be Coordinate work under this contract with other contract work relating to the same <br /> building/roof areas to assure efficient and orderly sequence of installation of materials . <br /> 1 . 10 Reference Standards : <br /> A . Products specified by association or trade standards must comply with those standards , <br /> except when more rigid requirements are specified herein or are required by applicable <br /> codes . <br /> Be The date of the standard is that which is in effect as of the bid date unless otherwise <br /> stated . <br /> C . Should there be a discrepancy between the referenced standards and these contract <br /> documents , the latter shall govern unless written interpretation is obtained from the <br /> Designer . <br /> D . Should there be discrepancies among the referenced standards ; the more stringent <br /> requirements shall govern . <br /> 09 -26 Summary of Work <br /> 010100 . 3 <br />