Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
general character of the site of the work and all existing buildings and structures within and adjacent <br /> to the site ; and has satisfied itself as to the nature of the work, the condition of existing buildings and <br /> structures , the conformation of the ground, the character, quality and quantity of the materials to be <br /> encountered ; the character of the equipment , machinery, plant and any other facilities needed <br /> preliminary to and during execution of the work ; the general and local conditions ; the construction <br /> hazards ; and all other matters , including but not limited to , the labor situation which can in any way <br /> affect the work under the Contract ; and including all safety measures required by the Occupational <br /> Safety Health Act of 1970 and all rules and regulations issued pursuant thereto . It is further mutually <br /> agreed that by submitting a proposal , the Contractor understands the feasibility and meaning of the <br /> plans , drawings , specifications , and other Contract Documents for the construction of the Work and that <br /> it accepts all the terms , conditions and stipulations contained therein ; and that it is prepared to work in <br /> cooperation with the other Contractors performing work on the site . <br /> 3 . ADDENDA <br /> Any addenda to specifications issued during the time of Bidding will be sent to each Bidder , return <br /> receipt requested and are to be considered covered in the Proposal and in closing a Contract they will <br /> become part thereof. It shall be the Contractor' s responsibility to ascertain prior to Bid time the issuance <br /> of any Addenda and see that its Bid includes any changes thereby required . Should the Bidder find <br /> discrepancies in, or omissions from, these drawings or documents or should it be in doubt as to their <br /> meaning , it shall at once notify the Designer , who may send written instruction in the form of Addenda <br /> to all Bidders . Notification shall not be later than seven ( 7 ) days from the date set for receipt of Bids . <br /> Neither the Owner nor the Designer shall be responsible for any oral instructions . All Addenda shall be <br /> acknowledged by the Bidders ( s ) on the Proposal form. Failure to do so may disqualify the Bid and may <br /> cause the Bid to be rejected . <br /> 4 . BID SECURITY <br /> Each proposal shall be accompanied by a cash deposit , or a certified check drawn on some bank or a <br /> trust company insured by the Federal Deposit Insurance Corporation, or a Bid Bond in an amount equal <br /> to not less than five percent ( 5 % ) of the Proposal, said deposit to be retained by the Owner as liquidated <br /> damages in event of failure of the successful Bidder to execute the Contract within ten ( 10) days after <br /> the award or to give satisfactory Surety as required by law . <br /> 5 . RECEIPT OF BIDS <br /> All copies of the Bid , the Bid security , if any , and any other documents required to be submitted with the <br /> Bid shall be enclosed in a sealed opaque envelope . The envelope shall be addressed to the party <br /> receiving the Bids and should be identified with the Project name ; Bid Number ; time and date of Bid <br /> Opening ; the Bidder ' s name and address ; Bidder ' s license number and , if applicable , the designated <br /> portion of the Work for which the Bid is submitted . If the Bid is sent by mail , the sealed envelope shall <br /> be enclosed in a separate mailing envelope with the notation ' SEALED BID ENCLOSED " on the face <br /> thereof. <br /> 6 . OPENING OF BIDS <br /> Bids shall be opened in public . Once any bid is opened , there shall not be any withdrawal of any Bidder <br /> and no Bids may be returned by the Owner to any Bidder . A Bidder may withdraw its formal Bid after <br /> the bids are opened without forfeiting its Bid deposit in certain limited circumstances . Withdrawal after <br /> opening is permitted only if all of the following conditions are met : <br /> A . The Bid was submitted in good faith . <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.