Orange County NC Website
Prebid Minutes <br /> Government Services Annex <br /> District Attorney Office <br /> September 21 , 2010 <br /> Page 3 <br /> Section 010100 — Summary of Work <br /> A summary of all work items is noted in this section . Bidders were advised that the facility will be <br /> occupied during construction and that all necessary safety precautions are to be taken. <br /> Brief Summary of Work as follows : <br /> • Removal and disposal of existing shingle roof systems . <br /> • Preparation of existing substrate to receive new shingle roofing . <br /> • Installation of underlayment over prepared substrate . <br /> • Installation of eave and ice dam protection . <br /> • Installation of glass fiber base granular surfaced , dimensional , asphalt shingles . <br /> • Installation of static and ridge ventilation . <br /> 0 Installation of sheet metal flashing and trim to include but not necessarily limited to edge <br /> flashing, valley , gutter, downspout , step flashing, and counterflashing . <br /> Pre job damage survey of facility and site required prior to beginning construction. <br /> Section 012000 — Price and Payment Procedures <br /> No comment. <br /> Section 012200 — Project Meetings <br /> No Comment <br /> Section 013216 — Construction Schedule <br /> Work may be performed throughout the week and weekends . Work may begin no earlier than 7000 <br /> a. m . Monday through Friday . Weekend work must be scheduled a minimum of 72 hours in advance . <br /> Work is to be performed on the District Attorney Office initially then proceed to the <br /> Government Services Annex. <br /> Work may be limited during voting period of October 12 at the Government Services Annex. <br /> Section 013300 — Submittals <br /> No Comment . <br /> Section 014000 — Quality Control <br /> 5thWall will be on site periodically throughout the duration of the project . <br /> Section 015000 — Temporary Facilities and Controls <br /> The Owner will furnish electricity and water required for construction . Access to electricity and <br /> water will be as designated by the Owner . All wiring needed to facilitate construction is to be <br /> temporary in nature and furnished and installed at no cost to the Owner . Upon completion of the <br /> work the wiring is to be removed and service restored to its original condition . <br /> A telephone is to be provided by the contractor at all times . <br /> Sanitary facilities are to be provided and maintained by the contractor . <br />