Browse
Search
2019-388-E AMS - Sasser Soltys remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-388-E AMS - Sasser Soltys remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 10:56:41 AM
Creation date
7/2/2019 10:38:32 AM
Metadata
Fields
Template:
Contract
Date
6/30/2019
Contract Starting Date
6/30/2019
Contract Ending Date
8/30/2019
Contract Document Type
Agreement - Construction
Agenda Item
5/2/19; 8-e
Amount
$80,500.00
Document Relationships
2019-555-E AMS - Sasser Soltys Phase II change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-388 AMS - Sasser Soltys remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 3 <br /> <br /> <br />PAINT <br />x All new drywall will receive one (1) coat of prime and two (2) coats of paint to match the <br />existing color. All other walls in the rooms will receive one (1) coat of paint to match. <br />FLOORING <br />x New vinyl cove base will be installed to match the existing cove base where removed. <br />x New VCT in the kitchen <br />ELECTRICAL <br />x Any electrical outlets in the affected walls will be relocated into the new stud wall as <br />necessary. <br />PLUMBING <br />x Detach and reset of plumbing fixtures in the kitchen to accommodate new wall framing <br />and cabinet install. <br />MOLD REMEDIATION <br />x Containment will be set up to protect all non-contaminated areas from exposure. Air <br />filtration devices (AFD’s) will be utilized during the demolition and reconstruction process. <br />All walls ceilings and floors will be HEPA vacuumed, then cleaned with an antimicrobial <br />solution and HEPA vacuumed a second time to remove all microbial growth. Carpet will <br />be cleaned with pressure steam to remove microbial growth. <br />MILLWORK <br />x Plastic laminate cabinets and plastic laminate countertops. Includes refrigerator cabinet, <br />lock at upper cabinet adjacent to ref. cab, handicap accessible sink cab, door and drawer <br />base cabs with 6 drawers. <br />x Cabinets to be standard flush overlay plastic laminate cabinet with dowel construction <br />in accordance with AWI guidelines. Cabinet interiors, including open cabinets and <br />drawers to be white melamine. Hardware to be Concealed 125 Degree Hinges, White <br />Euro Slides, and 4” Dull Chrome Wire Pulls. <br /> <br />ITEMS NOT INCLUDED <br />x Any work other than noted above <br />x HVAC and ductwork removal <br />x Any electrical other than noted above <br />DocuSign Envelope ID: 24F27DF9-0CA1-4BD8-997B-2A7D23FADE38
The URL can be used to link to this page
Your browser does not support the video tag.