Browse
Search
2019-388-E AMS - Sasser Soltys remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-388-E AMS - Sasser Soltys remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 10:56:41 AM
Creation date
7/2/2019 10:38:32 AM
Metadata
Fields
Template:
Contract
Date
6/30/2019
Contract Starting Date
6/30/2019
Contract Ending Date
8/30/2019
Contract Document Type
Agreement - Construction
Agenda Item
5/2/19; 8-e
Amount
$80,500.00
Document Relationships
2019-555-E AMS - Sasser Soltys Phase II change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-388 AMS - Sasser Soltys remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 2 <br /> <br /> <br />Soltys Adult Day Health Center Phase 2 <br />105 Meadowlands Drive <br />Hillsborough, NC 27278 <br />May 29, 2019 <br /> <br /> <br />GENERAL CONDITIONS <br />x Site supervision <br />x Project management <br />x Dumpsters <br />x Daily clean up <br />x Final clean <br />x Permit <br />DEMOLITION <br />x Removal and disposal all drywall and furring channels on the walls adjacent to the ice rink <br />in the kitchen and activity rooms. Acoustical ceiling grid will be removed to give access to <br />frame a new wall in front of the block walls. All ceiling tiles will be disposed of. <br /> <br />FRAMING <br /> <br />x A 3 5/8”, 20 ga metal stud wall will be framed 16” on center in front of the existing 6” <br />block walls. Walls will be framed to the deck above. <br />INSULATION <br />x 2” of closed cell spray foam insulation will be applied to the block walls between the stud <br />framing. <br />DRYWALL <br />x 5/8” Drywall will be hung, taped and finished ready for paint on the new metal stud <br />framing. <br />x Containment wall to be constructed in the general activity room. The wall will be <br />constructed of metal studs with ½” plywood on the outside. <br />ACOUSTICAL CEILINGS <br />x New acoustical ceiling grid will be installed to extend the existing grid to the new stud <br />wall. All ceiling tiles will be replaced with new tiles to match existing. <br />DocuSign Envelope ID: 24F27DF9-0CA1-4BD8-997B-2A7D23FADE38
The URL can be used to link to this page
Your browser does not support the video tag.