Browse
Search
Agenda - 02-20-2001-5c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 02-20-2001
>
Agenda - 02-20-2001-5c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:59:07 AM
Creation date
8/29/2008 10:28:38 AM
Metadata
Fields
Template:
BOCC
Date
2/20/2001
Document Type
Agenda
Agenda Item
5c
Document Relationships
Minutes - 02-20-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
NS RES-2001-016 Order Finding Time Warner Cable TV Rates Reasonable
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TJ-COG <br />Module H: True-Up Adjamtment Calculation <br />CAN Regulation <br />36 <br />• b t d e <br />l dne Ilne Description Hanslc Tier 2 Tier 3 Tier 4 Tier S <br />Adjustment For True-Up Period 1 <br />Hl Revenue From Period 1 $615,892.0200 <br />H2 Revcu= From Max Permitted Rate for Period 1 $637,212,6275 <br />H3 T-Up Period I Adjustment Vi&EIl] $21,320.6075 <br />H4 Blest on Period 1 Adjustment 51,832.6561 <br />Adjustment For True-Up Period 2 <br />H5 Revenue Fran Period 2 Eligible for Interest <br />H6 Revenue From Max Perm Rate for Period 2 Eligible Farlaterast <br />H7 Period 2 A4ptmeut Eligible For Interest WHS] <br />HS htm= on Period 2 Adjustment (See insttuctioug for fomuia) <br />H9 Revenue Froze Period 2Ineligible for Interest <br />H10 Rom we From Max Perm Rate for Period 3 hv.4 gjble for Interest <br />Hi I Period 2 A4wtmew Ineligible For Interest [HI04 9] <br />ToW True-Up Adjustment <br />H12 Previous Remaining True-Up AdjQftxxft <br />H13 ToW Tice-Up Adjustment [H3+H4+H7+M+H11+H12] $23,153.2636 <br />H14 Amomd afTrur Up Claimed For This Projected Period $23,153.2636 <br />HIS RemainingThv,-UpAdjustment [M3-HI4] $0.0000 <br />Part III: Projected Period <br />MWWe I: New Maximum Permitted Rate <br />a Is c d e <br />Line line Desert en Bask T1r2 Tiers Tier 4 Tian S <br />II Caps Method Segment For Projected Period [Wks 2] <br />12 Markup Method Segment For Projected Period [Wks 31 <br />13 Chen Wang Delete Segment For Projected Period [Wks 41S] <br />14 Rej.PeriodRateEligible17orlafladan[D8+F5+G5+Il+I2+I3] $7.9480 <br />15 Inflation Segment for Projected Period [(I4+C5).I4] $0.1908 <br />16 Headend Upgrade Segment For Projected Period [Wks 6] <br />I7 Exterud Costa Segment For Projected Period [Wks 7] $1.3853 <br />I8 True-Up Segment For Projected Period $0.3070 <br />119 Max Permitted Rate for Projected Period [I4+I5+I6+r7+I8] $9.8311 <br />I10 Operator Selected Rite For Pmjeoted Period $9.2900 <br />Using Tws inlation fipm <br />AIPR 12M $9.83 <br />AIEPB.123Sa $1.21 <br />Combined MPR $11.64 <br />Combined TWC Selected Rate $11.10 <br />duce $0.54 <br />Page 4 FCC Farm 1240, July 199E
The URL can be used to link to this page
Your browser does not support the video tag.