Browse
Search
2019-384-E AMS - Design Elements Link remediation signage
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-384-E AMS - Design Elements Link remediation signage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 2:30:46 PM
Creation date
6/28/2019 12:07:55 PM
Metadata
Fields
Template:
Contract
Date
5/6/2019
Contract Starting Date
5/6/2019
Contract Ending Date
5/31/2019
Contract Document Type
Contract
Amount
$2,265.42
Document Relationships
R 2019-384 AMS - Signarama Link remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 W. Margaret | Stairwell Department Sign 1 $52.00 $52.00 $52.00 <br />Material: Foam Board-Ultra Board 3/16" <br />Dimensions:b4"h x 12.4375"w <br />Direct Digital Printb- Single Sided <br />VHB tape on Back for Mounting <br />---- <br />To Replace Existing 3rd Floor Sign <br />8.1 Foam Board-Ultra Board 3/16" PVC faces - <br />9 Sinclair Building | Glass Door Vinyl | Interior Suite <br />Door 1 $104.04 $104.04 $104.04 <br />Material: Premium Opaque Vinyl <br />Digital Roll Print <br />Laminate: 3M 8519 Luster <br />Plottercut <br />-- <br />Applied to Interior Office Door <br />To Replace Homeownership Vinyl <br />~60" From Grade to Top of Graphic <br />9.1 Vinyl - Intermediate Digitally Printed - <br />10 Install / Trip Charges 1 $961.50 $961.50 $961.50 <br />Total Estimated Installation Time for All Locations: 4.5 Hours <br />* This time includes the time it takes to set-up, clean-up, and loading/unloading at each location <br />- (2) Installers | 4.5 Hours at $198.33/hour <br />Subtotal for Installs: $892.50 <br />---- <br />Total Miles Traveling for All Locations: 10.80 Miles <br />- (2) Installers | 10.80 Miles at $6.39/Mile <br />Subtotal for Mileage: $69.00 <br />---- <br />Total:b$961.50 <br />10.1 Installation - 2 People, Standard (no bucket truck) - <br />10.2 Trip Charge - In State (By Mile) - <br />Subtotal:$2,107.37 <br />Taxes:$158.05 <br />Grand Total:$2,265.42 <br />TURNAROUND TIMES: <br />Standard turnaround time for quick turn signage orders is 5-7 business days. <br />Custom fabricated signs require a longer production cycle and may take as long <br />as 4 to 6 weeks or longer depending on the complexity, the quantity of signs <br />ordered, and the scope of the project. If your sign requires permitting, we do not <br />begin fabrication until we have an approved permit from your town's planning <br />department. <br />Rush fees are available on quick turn signage made in our main store fabrication <br />department to expedite an order upon request. Please ask your sales <br />representative for details. <br />The above-mentioned prices specifications and conditions are satisfactory and are hereby accepted. <br />You are authorized to do all the work specified. Payment will be made as outlined above <br />Generated On: 4/25/2019 9:56 AM Page 3 of 4 <br />DocuSign Envelope ID: 90C19616-EF64-43BA-87A3-7B963CC866FB
The URL can be used to link to this page
Your browser does not support the video tag.