Browse
Search
2019-376-E Solid Waste - Sonoco recycling processing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-376-E Solid Waste - Sonoco recycling processing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 2:06:35 PM
Creation date
6/28/2019 12:06:39 PM
Metadata
Fields
Template:
Contract
Date
7/1/2019
Contract Starting Date
7/1/2019
Contract Ending Date
6/30/2021
Contract Document Type
Agreement - Services
Agenda Item
6/18/19; 8-p
Amount
$1,600,000.00
Document Relationships
Agenda 06-18-19 Item 8-p - Approval of Contract with Sonoco Recycling, LLC for Recycling Processing
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 06-18-19 Regular Meeting
R 2019-376 Solid Waste - Sonoco recycling processing
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: BF09ME9-7297-41B22-8360-A1 E6C073ECAF <br /> EONOCO <br /> RECYC <br /> UP" <br /> Canned Reporting <br /> Sonoco recently added functionality which provides our customers with the ability to pull <br /> "real-time Transactional reporting directly from our site. Pre-defined reports would include: <br /> Paid Transactions Report, Unpaid Transactions Report, and All Transactions Report. <br /> Load specific filter options are included with all reporting, which aids in providing you with a <br /> finished report which reflects your actual needs. <br /> Generating a predefined "Canned Report"—To generate a report, simply select the Reports <br /> option which is presented on the upper right-hand portion of sites main window (see <br /> illustration SB below). <br /> E6[ YIEIOt F<rY0fI0Z5 70Cf5 kifG _ -.. <br /> 0 mi 7.. Ls l. r,:i Samh Favonts.IF, <br /> Adtass-E�http:}IH'�caP.sOrficcO,LrimklWrt�lP /B�+e:.tGx �Go <br /> H..o User Drlin d Reports P.V,.w is Help logow <br /> J. <br /> terxo <br /> 0 2ala Sa.NN Yiew our legal and prn cy statement <br /> Illrrstrallon 6B <br /> Once in the Reports window,please choose a pre-defined report from the Select Report drop- <br /> down menu_ After making your report selection, please be sure to specify a date range from <br /> within the Ship Date From:/Ship Date To: date fields. Note, when generating a report, a date <br /> range must be filled in. <br /> Select a report <br /> Isoma Oxvr oatkmd Bapits POPem romans n::l. i9ens <br /> a� <br /> Reports �� r�--� <br /> Select Pt Port calms-d..en..erri.. J BOIt <br /> Flex Nr Ve:dor hvr�; <br /> CommaOyY pii Check t <br /> east t: <br /> sh;o oe+.reom:x:.nv:mo s*_ro a.e ro.nvz>rnw <br /> A+A� <br /> emin Smxe.v=wgd ed 9nncy am�m <br /> Select your Date Range <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.