Orange County NC Website
DocuSign Envelope ID: BF09D2E9-7297-4B22-8360-A1 E6C073ECAF <br /> For example,for a Vendor who bids a Processing Fee of$75/ton, a Contamination Disposal Fee of <br /> $60/ton, and a 90% Revenue Share would calculate the Fee charged or Rebate offered in the <br /> following manner: <br /> Fee Calculation Example with Glass <br /> (Fee) Rebate per Ton = (Revenue Share x AMV)-(Contamination Handling Fee x Contamination Rate) <br /> - Processing Fee = (80%x 43.68)-($30.00 x 13.80%)-$80 = ($49.20/Ton) Fee Paid by Orange <br /> County to Contractor <br /> Chart With Glass <br /> Allocation Price per <br /> Material Type Percent ton AMV per ton <br /> Glass 24.30% $ (25.00) $ (6.08) <br /> Aluminum Cans 0.90% $ 1,340.00 $ 12.06 <br /> Steel 1.50% $ 110.00 $ 1.65 <br /> HDPE color 1.20% $ 330.00 $ 3.96 <br /> HDPE Natural 0.80% $ 820.00 $ 6.56 <br /> PET 3.80% $ 305.00 $ 11.59 <br /> Mixed Paper <br /> (psi) 30.90% $ (5.00) $ (1.55) <br /> Plastics 3-7 0.60% $ (60.00) $ (0.36) <br /> OCC(PS 11) 22.20% $ 90.00 $ 19.98 <br /> Residual 13.80% $ (30.00) $ (4.14) <br /> 100% E $ 43.68 <br /> Fee Calculation Example without Glass <br /> For example: a Contractor who bids a Processing Fee of$80/ton, a Contamination Disposal Fee of <br /> $30/ton, and a 80% Revenue Share would calculate the Fee charged or Rebate offered in the <br /> following manner: <br /> 12 of 21 <br /> RFP No. 5259 <br />