Orange County NC Website
DocuSign Envelope ID:7CF6OB58-F95B-4FFA-9EO3-OFA429EC47E7 <br /> Attachment B <br /> SQLITUDEjam" <br /> LAKE MANAGEMENT <br /> bib <br /> INITIAL LAKE TREATMENT CONTRACT <br /> PROPERTY NAME: Friends of Lake Orange <br /> CONTRACT DATE: April 30, 2019 <br /> SUBMITTED TO: Mike Bruhns <br /> SUBMITTED BY: Trent Nelson <br /> SPECIFICATIONS: Four (4) Treatments in a Two (2) Acre Treatment area closest to 600 Hamecon Place <br /> Lake Aquatic Weed Control; <br /> 1. Any growth of American lotus found in the lake shall be treated and controlled <br /> through the application of contact and systemic aquatic herbicides and surfactants <br /> as required for control of the specific varieties of aquatic weeds found in the lake at <br /> the time of application. <br /> 2. Systemic herbicide will be applied at the rate appropriate to achieve long-term <br /> control of the unwanted submersed and floating aquatic weeds present in the lake <br /> and susceptible to the herbicide at the time of application. <br /> 3. Treatment of a lake with high turnover, as a result of regular water inflow and <br /> outflow, will be performed in a series of multiple applications in which the systemic <br /> herbicides are applied over the period of time required to maintain an acceptable <br /> concentration of the systemic herbicides in the lake necessary for the effective <br /> control of the specific target species- The total treatment period varies by plant <br /> species but is typically for a period of thirty (30) to sixty (60) days. <br /> 4. Water tests will be performed on water samples taken from the lake during the <br /> treatment period as required to determine the ppb concentration of the systemic <br /> herbicides in the water and the ideal timing for subsequent applications. <br /> 5. Lakes which require the use of contact aquatic herbicides and have more than fifty <br /> percent (50%) coverage of undesirable aquatic weeds /vegetation will receive a <br /> minimum of two (2) applications of the contact herbicide. The first application will <br /> be made to treat'/z of the lake and a second follow up application will be made <br /> approximately ten (10) days later to treat the remaining '/z of the lake. <br /> *Contractor will take all reasonable precautions and make every effort to avoid any damage <br /> to non-target plants within the treatment area. However, contractor makes no guarantee <br /> that such damage will not occur despite our best efforts to the contrary. By signing this <br /> contract, customer accepts this disclaimer, and acknowledges and accepts the minimal risk <br /> that such damage might occur. <br /> Permitting: <br /> 1. SOLitude staff will be responsible for the following: <br /> ❑. Obtaining any Federal, state, or local permits required to perform any work <br /> specified in this contract where applicable. <br /> Competitively Sensitive&Proprietary Materials—The information contained herein as the intellectual property of S0Litude Lake Management. <br /> Recipient may not disclose to any outside party any proprietary information. processes, or pricing contained in this document or any of its <br /> attachments without the prior written consent of SOLitude Lake Management This document is provided to the recipient in good faith and it shall <br /> be the resDonsibility of the recipient to keen the information contained herein confidential. <br />