Browse
Search
2019-346-E AMS - HH Architects EAC contract amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-346-E AMS - HH Architects EAC contract amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 11:20:28 AM
Creation date
6/21/2019 10:49:20 AM
Metadata
Fields
Template:
Contract
Date
6/6/2019
Contract Starting Date
4/5/2016
Contract Document Type
Contract Amendment
Agenda Item
2/5/19; 6-b
Amount
$191,500.00
Document Relationships
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
Agenda - 02-05-2019 6-b - Northern Campus Project Update
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 02-05-19 Regular Meeting
R 2019-346 AMS - HH Architects EAC contract amendment
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />May 10, 2019 <br />Alan Dorman <br />Director, Asset Management Services <br />Orange County Government <br />131 West Margaret Lane, Suite 300 <br />PO Box 8181 <br />Hillsborough, NC 27278 <br />Re: Orange County Environment and Agricultural Center – Amendment #2 <br />HH Project Number: 15-082 <br />Dear Alan, <br />HH Architecture is pleased to present this Amendment #2 proposal for the design of the Orange <br />County Environment and Agricultural Center (EAC) and Parks Operations Base. <br />1. Scope <br />A. Provide design and engineering services for the incorporation of sustainability features <br />into the EAC and Parks Operations Base as approved during the February 5, 2019 <br />BOCC meeting. <br />1. Features for EAC: <br />a. 50 kW photovoltaic (PV) array, roof-mounted, ballasted type system. <br />1. Design assumes PV array is a string inverter system. It is understood <br />that any panels that will not fit on the Parks Base will be re- <br />budgeted/reallocated to the EAC as it is the more economical facility for <br />the system. Our engineers have redesigned the HVAC system to an all- <br />electric variable air volume (VAV) following schematic design due to the <br />rooftop PV system. <br />b. Solar Hot Water System <br />1. Electrical and plumbing engineering work required for tank system. <br />A. Will be incorporated near spaces with largest hot water demands <br />(e.g. kitchen). <br />2. Structural engineers required to recalculate/resize increased deadload in <br />the steel framing. <br />2. Features for Parks Operations Base: <br />a. 50 kW photovoltaic (PV) array similar to the EAC system. <br />DocuSign Envelope ID: E6011B64-57D6-4234-8FF6-D8B498A5444B
The URL can be used to link to this page
Your browser does not support the video tag.