Orange County NC Website
The EI Group, Inc. x 800.717.3472 x www.ei1.com <br />samples will be used to evaluate employee exposure during a normal shift. EI personnel are available to <br />complete the proposed work as needed. <br />Proposed Schedule <br />One (1) day on site in the Summer of 2019 is expected to be required to collect the data requested. A complete <br />written report will be submitted as an electronic PDF document as directed by you, within fourteen (14) to <br />twenty-one (21) days of completion of the field work. <br />Quality Control <br />Personal dosimeters will be calibrated before and after use with a sound level calibrator, calibrated within the <br />previous twelve months. Confirming noise level measurements will be taken with a calibrated Type II sound <br />level meter, also calibrated prior to the survey being conducted. <br />Estimated Time and Fees <br />Discipline Sampling Strategy Cost <br />Noise Includes one-day onsite, travel, expenses, sampling for noise and report. $1,695.00 <br />Total $1,695.00 <br />An invoice for the full project amount will be submitted following delivery of the final report. Thank you for <br />allowing EI to assist in this important aspect of your operations. If you have any questions concerning this <br />proposal, please do not hesitate to contact me at 800-717-3472. <br /> <br />Regards, <br />The EI Group, Inc. <br />Adam H. Underwood <br />Vice President, Business Development <br />DocuSign Envelope ID: 22367E6B-5942-47DA-B321-4ACB7F6086D4