Orange County NC Website
Inspectors Certification Board , who is properly registered to perform such <br /> inspections within Orange County , no less than one ( 1 ) time in every five <br /> ( 5 ) year period ( unless inspections are required more often by rule or <br /> regulation of the Orange County Health Department) and to have the <br /> system pumped if recommended by the inspector . <br /> Payment for the inspections required under this condition shall be the <br /> responsibility of the individual lot owner or the homeowner' s association <br /> as established by the governing Homeowner' s Association declaration . <br /> These provisions shall be in a form approved by the County Attorney , <br /> C . Wells <br /> 1 . Each residential lot shall contain an adequate area reserved for the <br /> development of a well to provide potable water supporting development of <br /> the property as ultimately reviewed , approved and permitted by the <br /> Orange County Division of Environmental Health . <br /> D . Roads and Access <br /> 1 . The roads Birdie Lane and Bogey Court shall be a minimum of 20 feet <br /> wide and paved to NC DOT standards . <br /> Each public roadway , as well as the proposed stormwater management <br /> system to support the roads , shall be located within a minimum 50400t <br /> right- of-way . Construction shall be inspected and approved by NCDOT . <br /> OR <br /> A Letter of Credit or escrow agreement shall be submitted to secure <br /> construction of the aforementioned roadways to the standards Section 7 . 4 <br /> of the UDO . <br /> An estimate of the construction cost must be prepared by a <br /> certified / licensed engineer or grading contractor and submitted to the <br /> Planning and Inspections Department . The financial guarantee must <br /> reflect 110 % of that estimate and be issued by an accredited financial <br /> institution licensed to do business in North Carolina . <br /> In this instance , the document shall state posted financial guarantee ( s ) <br /> will not be released until the road construction has been inspected and <br /> approved by Orange County . <br /> 2 . All lots shall receive access from the above public roads . No driveway <br /> access for any of the lots shall be permitted off of US Highway 70 East . <br /> 3 . The approved Erosion Control and Stormwater Management Plan for <br /> construction for the aforementioned roadways shall be continued and <br /> coordinated with the Orange County Erosion Control Division to ensure <br /> the appropriate design , requirements and standards are met . <br /> 4 . Approved double - bladed street name signs shall be bonded for or erected <br /> at the intersections of public streets prior to Planning Department <br /> signatures on the Final Plat or prior to issuance of any building permit if <br /> road construction is secured by letter of credit as described herein . <br />