Browse
Search
2019-332-E AMS - Brown Bros Cedar Grove Bathhouse sewer
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-332-E AMS - Brown Bros Cedar Grove Bathhouse sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 9:51:24 AM
Creation date
6/18/2019 9:00:59 AM
Metadata
Fields
Template:
Contract
Date
6/10/2019
Contract Starting Date
6/20/2019
Contract Ending Date
6/30/2019
Contract Document Type
Agreement - Services
Amount
$7,738.00
Document Relationships
R 2019-332 AMS - Brown Bros Cedar Grove Bathhouse sewer
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1152D302-3E2A-4168-95EB-7031BEAF5629 <br /> ROWN # <br /> JsRoTHER.S <br /> FAX QUOTE FROM: <br /> BROWN BROTHERS PLUMBING AND HEATING <br /> PH. #919-220-2554 . . N.C. LIC. #282 . .FAX #919-220-2531 <br /> DATE: May 13, 2019 <br /> ------------------------------------------------------- <br /> JOB NAME : Cedar Grove Community Center <br /> Att: Eddie Hutter <br /> Email: ehutter@orangeaountyno.goer <br /> Location: Hillsborough <br /> Ref: Bath House Sewer Pump Line Replacement <br /> Scope of Work: f <br /> Provide materials and labor to replace approximately 420' of <br /> sewer pump discharge line from the bath house pump station. <br /> i <br /> Proposal. Includes: <br /> Pipe and fittings shall be 211 PVC schedule 40 pressure. <br /> Upgrade pump connection with new check valve, isolation valve <br /> and clean-out tee. <br /> Connect to existing line near access road. <br /> Seed and straw disturbed areas. <br /> FOR THE PRICE OF: $ 7, 738. 00 <br /> Labor rates are based on working hours of 7:30 AM t❑ 4:00 PM weekdays. <br /> EXCLUSIONS: Bond <br /> Proposal may be withdrawn if not accepted with-in 30 days <br /> AUTHORIZED SIGNATURE: <br /> on - Project Manager <br /> PC Box 15668.2820 North Roxboro Road - Durham, NC 27704-0668 •Telephone(919)220-2554 • Fax(919)220-2531 <br />
The URL can be used to link to this page
Your browser does not support the video tag.