Orange County NC Website
T <br />2. Design phase. <br />a. A design consultant shall be selected by and under contract with <br />OWASA to develop plans for the Project The design shall be based on specifications and <br />requirements provided by OWASA. Both parties shall approve the scope of work for the <br />design consultant. <br />b. The costs of the design work shall initially be paid for by OWASA. <br />The County shall periodically reimburse OWASA for all costs associated with the design <br />of the Project <br />c. In order to ensure pmper'and effective project management, the design <br />0 <br />consultant and any sub-.consultants shall report to OW who shall work closely <br />with County staff to ensure the County's requireuf the 'ect are met. In the <br />event of any apparent conflicts between the s?d OWASA s requirements, the <br />parties shall work together to mpromise and accommodations for the <br />i <br />Project. I In clo o lion with OWASA and consistent with the need for <br />effective project management as outlined in Section 2c above, the County Staff will have <br />full access to the design consultant and all relevant sub-consultants for any aspect of the <br />Project OWASA'will authorize the design consultant and subcontractors to meet with <br />County representatives or provide any information needed by the County on any aspect <br />of the Project. <br />3. Construction phase. <br />a. The bidding procedure for the construction contract shall be