Orange County NC Website
mechanism for constructing the water line extension project along with the necessary project <br />administrative and engineering/design services as well. <br />Details must still be worked out as to public financing of availability fees charged by OWASA, <br />and how the on-site plumbing costs that will ultimately be incurred at each individual dwelling <br />unit will be paid. Likewise, how those costs will be funded has yet to be determined. However, <br />it has been the Board's stated intention to use reserves from the landfill enterprise fund to pay <br />the costs of extending the water lines into the Rogers Road neighborhood as depicted on the <br />map exhibit to the draft interlocal agreement. <br />FINANCIAL IMPACT: The projected cost of constructing the water line extension project with <br />administrative and engineering costs is $550,000. This cost is to be borne by the landfill <br />enterprise fund. Other costs such as availability fees, connection costs, etc., will be determined <br />at a later date. Likewise, the source or sources of funding for these costs will be determined at <br />a. later date. <br />RECOMMENDATION(S): The Manager recommends that the Board approve the contract <br />between OWASA and the County in substantially the form of the attached draft and authorize <br />the Chair to sign it, subject to final review by staff and the County Attorney.