Orange County NC Website
1 <br /> <br />February 25, 2000 <br />ATTACIMMNT B <br />COST ESTIMATES FOR <br />PROPOSED WATER MAIN EXTENSION PROJECT FOR <br />ROGERS ROAD AREA <br />COSTS' <br />1. Line 1. 12" WM Along Rogers Road, From Allen $226,000 <br /> To Chapel Will Urban Transition Boundary (3,560 LF) <br />2. Line 6 8'.' WM Along Rauch Road (850 LF) 40,000 <br />3. Line 7 8" WM along Purefoy Road (1,120 LF) 48,000 <br />4. Line 8 8" WM Along Sandburg Lane (890 LF) 43,000 <br />5. Line 9 8" RIM In Rauch Rnad/Puzefoy Road 137,000 <br /> Area North and East of Rogers Road (2,920 LF) <br />6: Line 10 8" WM In Allen Street and Properties South (1,180 LF) 40,000 <br />7. Estimated Cost of Design, Easement and Construction 534,000 <br />8. Estimated Cost of OWASA's Administrative Overhead (3%) 16,000 <br /> TOTAL ESTIMATED COST OF THE PROJECT $550,000 <br />x All costs are based oa report titled, "Cost Estimates for Extending the Water and Sewer Systems to Serve <br />the Area New the Orange County Sanitary Landfill", dated October, 1997. Cost are inflated by 5% per year <br />to reflect Year 2000 dollars.