Orange County NC Website
<br /> <br /> <br />2. Final Pricing: Pricing applicable to the contract will be set as follows: <br />a. Processing Fee: There will be a variation of the processing fee based on any reduction in <br />the amount of glass in Orange County’s recycling stream as determined by the <br />composition determined pursuant to Section 1 of this Attachment A. The processing fee <br />will originally be $___ per ton and will adjust as set forth in the following chart: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />b. Contamination Fee: There will be no fee for contamination in the County recycling delivered <br />to the Provider. The County will, however, at no cost to Provider, backhaul an amount of residue <br />equivalent to the tons of residual included in Orange County recycling. For July, August and <br />September of 2019, that amount shall be ------% of the total tons delivered to Provider by Orange <br />County Solid Waste for processing. Thereafter, the amount shall be the residual amount in the <br />County recycling as determined under Section 1 of this Attachment A. <br /> <br />c. Orange County will coordinate the removal of residue in an amount equivalent to the tons <br />allocated to the contamination percentage, for July, August and September of 2019 set at ------% of <br />the tonnage amount of material delivered by Orange County to the Provider, in a manner so as not <br />to negatively impact Orange County operations or the Providers operations. Subsequently, the <br />residual amount for backhaul at County expense shall be determined as set forth in Section 1 of this <br />Attachment A. Provider will load County walking floor trailers with baled residue for hauling. <br />Loading will be done in a manner that complies with the recommended loading method of the <br />walking floor trailer manufacturer and comply with all load limits set forth by the manufacturer and <br />North Carolina Department of Transportation. <br /> <br />d. County revenue Share shall be 100% of the AMV <br /> <br />e. The chart to determine AMV and example of the formula with percent as established by the <br />Kessler Study is set forth below. Price per ton for each listed item is to be the Southeast Regional <br />Average determined from the Prices Listed On Recyclingmarkets.net on June 1, 2019 and updated <br />Glass Processing <br />>15% $ <br />>11%-15% $ <br />>6%-11% $ <br />0-6% $ <br />11