3
<br /> Orange County Southen Campus:Phase 1 -Seymour Center
<br /> Chapel Hill,North Carolina
<br /> 14-May-19
<br /> Single Prime General Contractor License No. Carl MBE Base Bid Alternate Alternate Alternate Ahemate4 Alternate Alternate Alternate? Alternate Alternate AlternateE-t Total
<br /> Check-Bid Recessed Mounted Extension of Existing Replacement of Existing Motorized Operable Additional Storage Latimete Adhered Stone Owner Preferred Alternate. Audio Visual Electrical Concrete Paving at Packing EST Quick Start Fire Alarm
<br /> Bond Retractable Stage Entrance Canopy Great Hall Flooring PadNon(Manual Pentsm in Veneer System(ashamed) Door Hardware-Von Duprin Rough-in Lot Manufacturer
<br /> Base Bid) Exit Devii Corbin
<br /> Lccksets
<br /> Bar Construction Company,Inc 7973 5% YES $4,646,300.00 $43,80000 $246,80000 $25,80000 $23,40000 $31,700.00 $4,30000 $000 $9,500.00 $217,90000 $9,40000 $5,258,900.00
<br /> HM Kem 8542 5% YES $4,458,000.00 $32,00000 $75,000.00 $23,50000 $22,00000 $23,000.00 $000 $000 $8,700.00 $82,000.00 $8,60000 $4,732,800.00
<br /> Muter Construction 73D95 5% YES $4,326,000.00 $33,000.00 $95,000.00 $21,000.00 $25,000.00 $16,000.00 $6,000.00 $0.00 $15,000.00 $200,000.00 $2,500.00 $4.739,500.00
<br /> Resolute Construction 14397 5% YES $4,409,300.00 $30,900.00 $74,800.00 $20,500.00 $20,400.00 $18,100.00 $6,400.00 $0.00 $21,700.00 $213,900.00 $11,270.00 $4,827,270.00
<br /> 1 ceNfy that the above bids are conect as tabulatedaµln9ly Ir,
<br /> W t�
<br /> A S
<br /> 12(f17 �'P
<br /> 'viq F I GSi.p+ Y
<br /> 'nnunan'
<br /> Smith SinneB Architecture,P.A.
<br /> Drew Wilgus,AIA
<br />
|