Orange County NC Website
4 <br />•NSBRT is currently in FTA Project <br />Development <br />•Includes 30% Design & Environmental <br />•30% Design <br />•Further defining alignment and specific <br />station locations from the initial Locally <br />Preferred Alternative (LPA) <br />•Traffic analysis <br />•Integration of bicycle and pedestrian <br />facilities <br />•Station area analysis <br /> <br /> <br /> <br />Current Status Joint Executive Boards 5/29/2019 Item 4ii <br />Page 4 of 8 <br />10