Orange County NC Website
FY 2019-20 Manager Recommended Fee Schedule <br />Footnotes <br />(1) Increase in special event demands <br />(2) Change in title to be consistent with UDO <br />(3) Stormwater Management Plan Review Fee of $500 applicable "Per Primary Stormwater Control Measure (SCM) <br />(4) Stormwater Management Plan Review Fee as Low Impact Development (LID). Qualifying a project as LID satisfies our UDO <br />Stormwater Management Requirements <br />(5) Conservation Area Document Review per each area to cover cost associated with increased expenses in plan/study <br />approval and the subsequent follow up to ensure proper language and recordation. <br />(6) This requirement is specific to UDO Section 6.14.10©(4)(d) <br />(7) Remove fee, as this sort of development usually pays as Intense Urban Erosion Control Plan Review + Land Disturbing <br />Permit Fees <br />(8) Remove fee, Efland Sewer System has been transferred to the City of Mebane <br />(9) Increase to reflect cost recovery <br />(10) Allows Solid Waste to Broaden this service to charge county buildings and commercial opportunities. <br />80