Browse
Search
Agenda 06-18-19 Item 6-a - Approval of Fiscal Year 2019-20 Budget Ordinance, County Grant Projects, and County Fee Schedule
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 06-18-19 Regular Meeting
>
Agenda 06-18-19 Item 6-a - Approval of Fiscal Year 2019-20 Budget Ordinance, County Grant Projects, and County Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 2:14:56 PM
Creation date
6/14/2019 1:09:58 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda 06-18-19 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 06-18-19 Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Approved Fee Schedule - FY 2019-20 <br />* Any fee changes will be included in this column; <br />a blank beside each fee means there is no fee change in FY 2019-20 Commissioner Approved Fee Schedule <br />Department/Program Description Current Fee <br />Commissioner Approved <br />Fee Change for <br />FY 2019-20* <br />Last <br />Revision <br />Erosion Control Fees Erosion Control Plan Review <br /> Intense urban $507.00 per acre 2001 <br /> Urban $272.00 per acre 2001 <br /> Rural $158.00 per acre 2001 <br />Land Disturbance (Grading) Permits (2) <br />Change Title to "Land Disturbing <br />Permit"2018 <br /> Intense Urban $1,241.00 per acre 2001 <br /> Urban $646.00 per acre 2001 <br /> Rural $310.00 per acre 2001 <br />Private Roads $155.00 1998 <br />Storm water Management Plans (3)$500.00 $500 per SCM 2011 <br />Storm water Management Plan Review (LID) (4)$300.00 NEW <br />Conservation Area Document Review (5)$200 per area NEW <br />Recurring 5th-Year SCM Inspection (6)$360 per SCM NEW <br />Surface Water Identification (SWID) field work. <br />Stream Origin and Intermittent/Perennial <br />Determinations <br />1-2 determinations/site $200 <br />3-6 determinations/site $500 <br />7-9 determinations/site $1000 <br />10-12 determinations/site $1200 <br />13-16 determinations/site $1500 <br />17-19 determinations/site $2000 2012 <br />Infill /redevelopment (4) <br /> Flat fee of $10,000 for projects less than 5 <br />acres. 5 acres or greater use intense urban Remove Fee 2011 <br />Inspection fees <br />Building Schedule A <br /> New Residential (1&2 family)$0.394/sq. ft. (all trades included)2018 <br /> Building 0.160/sq. ft. / $110.00 Min 2018 <br /> Electrical 0.074/sq. ft. / $110.00 Min 2018 <br /> Plumbing 0.074/sq. ft./ $110.00 2018 <br /> Mechanical 0.086/sq. ft. / $110.00 2018 <br />Plan Review <br />0.0203/sq. ft. $25.00 min. 12% surcharge for <br />Hillsborough 2018 <br />Schedule B <br />32
The URL can be used to link to this page
Your browser does not support the video tag.