Orange County NC Website
01/31/2001 10:58 9199187346 ZONING&INSPECTIONS PAGE 05 <br />(collectively referred to herein as the "Fields") am a softball/baseball field (Schell a A. Field 1), <br />two soccer/practice fields (Schedule A, Fields 3a and 3b) and six (6) tennis courts (Schedule A, <br />Field 4). <br />It is the intention of the Board of Education to complete construction of the Fields and <br />begin use thereof at the earliest possible time. In this connection, irrigation systems and sod are <br />planned for installation on recreational Fields 1 and 3a. The Board of Education agrees to install <br />an irrigation system and sod on Field 3b, the cost of such installation to be paid b the Board of <br />Education, In consideration for these improvements, Field 3b will be available for use by the <br />Board -of Education during all days that school is in session until the end of the gular school <br />day. The parties agree that Field 3b shall be available for Town use commencing at 4:00 p.m. on <br />days that school is in session. <br />(a) Lights or Even' The parties hereto, either jointly or, if one of <br />them decides to do so, independently, may purchase and install conduits and/or lights at any <br />Field or Fields either during the initial field construction or anytime in the future. <br />(b) -Miscellaneous 'tie The Board of Education will provide a backstop, <br />dugout area and bench, and perimeter fence for the softballlbaseball field (Schedule A, Field 1), <br />a scoreboard and two professional quality soccer goals for each of the soccer fields Schedule A. <br />Fields 3a and 3b), sufficient bench space to seat two full soccer teams at each of the soccer <br />fields (Schedule A, Fields 3a and 3b), a minimum of four (4) trash receptacl , and toilet <br />facilities. The Board of Education will seek donations of an electronically operate scoreboard <br />from a private third party. Provided, however, that if the Board of Education cane find such a <br />third party to donate an electronically operated scoreboard, the Board of Educati o is under no <br />obligation to provide an electronically operated scoreboard. <br />2. Payment of C and To <br />Contributions - <br />I Constructs oats. Upon the <br />completion of the constriction work and installation of amenities described above 6 accordance <br />with a Conditional Use Permit to be reviewed by the Town for this project, the Co?mty and the <br />6 <br />d