Browse
Search
2019-301-E AMS - Summit Design and Engineering EMS stormwater maintenance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-301-E AMS - Summit Design and Engineering EMS stormwater maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 2:20:45 PM
Creation date
6/3/2019 9:59:31 AM
Metadata
Fields
Template:
Contract
Date
5/20/2019
Contract Starting Date
5/20/2019
Contract Ending Date
6/30/2019
Contract Document Type
Contract
Amount
$1,650.00
Document Relationships
R 2019-301 AMS - Summit Design and Engineering EMS stormwater maintenance
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:49C3D6C6-17EB-4320-B1DF-601984A397F2 <br /> DocuSign Env@IvjuC3D6C6-17EB-4320-B1DF-601984A397F2 <br /> SUMtIT <br /> DESIGN AND ENGINEERING SERVICES <br /> Task 2 -Annual Maintenance Inspection: <br /> SUMMIT will perform one (1) field site inspection of the existing stormwater management <br /> BMP facility and all associated appurtenances. We will take measurements as needed and <br /> document the conditions with pictures. If it is determined that any maintenance is required <br /> prior to an Engineer's Certification of approval, we will provide a list of the items needed <br /> to be completed. <br /> Task 3 —Annual Inspection Report and Certification: <br /> Upon completion of Task 2 we will provide an annual inspection report and Engineer's <br /> Certification to be submitted to the Town of Hillsborough Stormwater and Environmental <br /> Services Division. The report will include a full summary of the BMP conditions, pictures <br /> and any recommendations. <br /> Task 4 -- Hourly Services: <br /> We do not anticipate that any meetings will be required to complete the scope outlined in Tasks <br /> 1 and 2. If any meetings or additional tasks are required or requested by the client, they will <br /> be done on an hourly basis according to the attached Schedule of Standard Rates, or per an <br /> approved Change Order. Task 2 includes one (1) site inspection of the Stormwater Management <br /> Facility. If maintenance is required prior to issuing a final certification approval, any subsequent <br /> site inspections will be done on an hourly basis. <br /> ASSUMPTIONS & EXCLUSIONS: <br /> • Additional services outside this scope of services will be provided if requested by the <br /> Client for a negotiated lump sum fee or at our standard hourly billing rates. <br /> CLIENT RESPONSIBILITIES: <br /> It shall be the responsibility of the Client to provide the following items: <br /> 1. Access to the site. <br /> 2. Decisions on critical issues as necessary in a timely manner. <br /> 3. Payment of all invoices per conditions of the agreement. <br /> 4. Client/Owner to be responsible for the payment of all regulatory agency fees if/when <br /> required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.