Browse
Search
2019-301-E AMS - Summit Design and Engineering EMS stormwater maintenance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-301-E AMS - Summit Design and Engineering EMS stormwater maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 2:20:45 PM
Creation date
6/3/2019 9:59:31 AM
Metadata
Fields
Template:
Contract
Date
5/20/2019
Contract Starting Date
5/20/2019
Contract Ending Date
6/30/2019
Contract Document Type
Contract
Amount
$1,650.00
Document Relationships
R 2019-301 AMS - Summit Design and Engineering EMS stormwater maintenance
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:49C3D6C6-17EB-4320-B1DF-601984A397F2 <br /> DocuSign Envelope ID:49C3D6C6-17E6-4320-B1DF-601984A397F2 <br /> SUML4—IT 919.732.3883 SUMMIT-ENGINEER.COM <br /> DESIGN AND ENGINEERING SERVICES 504 Meadowland Drive, Hillsborough,NC 27278 <br /> June 26, 2018 (EXHIBIT A) <br /> Orange County Asset Management Services <br /> Attn: Angel Barnes <br /> PO Box 8181 <br /> Hillsborough, NC 27278 <br /> a ba rn esCao ra n geco u nty..g yv <br /> Re: Orange County EMS Parking Lot Expansion — Hillsborough, NC - Annual <br /> Stormwater BMP Maintenance Inspection & Certification <br /> Orange County Tax Parcel PIN: 9874802738 <br /> Dear Angel: <br /> SUMMIT is pleased with the opportunity to provide this scope and fee proposal for consulting <br /> services to perform the required annual inspection and certification for the Stormwater <br /> Maintenance Facility at the above referenced location. Our scope of work to be provided is <br /> further outlined in the following section of this proposal. We look forward to working with you <br /> and assisting you with this project. <br /> Crtr;r�i7� a' <br /> c�r'IhV — <br /> S <br /> 2 <br /> y <br /> SCOPE OF WORK <br /> Task .I —Asbuilt Survey of the Sand Filter SCM: <br /> SUMMIT will prepare an as-built survey of the existing Sand Filter BMP, including location <br /> and elevations of all structures, inverts, grate inlets, pipes, cleanouts and openings as <br /> accessible. The as-built survey information will be provided as an attachement to the <br /> Annual Certification and inspection report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.