Browse
Search
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 10:38:16 AM
Creation date
6/3/2019 9:58:22 AM
Metadata
Fields
Template:
Contract
Date
6/3/2019
Contract Starting Date
6/3/2019
Contract Document Type
Agreement - Services
Agenda Item
5/21/19; 8-d
Amount
$170,280.00
Document Relationships
Agenda 05-21-19 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 05-21-19 Regular Meeting
R 2019-297 AMS - Stewart Cooper Newell Architects ES Efland substation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D488A4DA-6COC-4F1F-A676-98CFE932E2B5 <br /> DESIGNER'S COMPENSATION <br /> 7.1 Compensation for Basic Services <br /> 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner <br /> for all services under this Agreement. <br /> 7.2 Breakdown of Compensation for Basic Services <br /> Not-to-exceed Compensation for Basic Services consists of the following compensation for the following <br /> separate categories of services: <br /> 7.2.1 Schematic Design Phase. Lump Sum fee of$28,320.00(Twenty Eight Thousand,Three Hundred <br /> Twenty Dollars). <br /> 7.2.2 Design Development Phase. Lump Sum fee of$28,320.00 (Twenty Eight Thousand,Three Hundred <br /> Twenty Dollars). <br /> 7.2.3 Construction Document Phase. Lump sum fee of$49,560.00(Forty-Nine Thousand Five Hundred <br /> Sixty Dollars). <br /> 7.2.4 Bidding and Contract Award. Lump sum fee of$7,080.00(Seven Thousand Eighty Dollars) <br /> 7.2.5 Construction Phase. Lump sum fee of$21,240.00(Twenty One Thousand,Two Hundred Forty <br /> Dollars). <br /> 7.2.6 Post Construction Phase. Lump sum fee of$7,080.00 (Seven Thousand Eighty Dollars) <br /> 7.2.7 Additional Basic Services(Select all that apply): <br /> Storm Water Management Design. Lump Sum fee of$8,000.00(Eight Thousand Dollars) <br /> Design of 60 kW Solar System. Lump Sum fee of$5,200.00(Five Thousand Two Hundred Dollars) <br /> Reimbursable Expenses(10%of Design Costs).Time& Materials Not to Exceed$15,480.00(Not To <br /> Exceed Fifteen Thousand Four Hundred Eighty Dollars) <br /> 7.3 Payment for Basic Services Rendered, as described in Attachment B <br /> 7.3.1 Payment to the Designer for Basic Services shall become due and payable as progress deliverables <br /> and categories of services are completed. Upon completion of each category, payment will be made by the <br /> Owner within 30 calendar days of receipt of an invoice which is in form and substance acceptable to the <br /> Owner.When applicable such invoice shall include supporting documentation, as designated by Owner,for <br /> any reimbursable expenses claimed by Designer. In the event the Owner finds any part or parts of all or any <br /> portion of an invoice presented by the Designer not to be acceptable, it shall identify to the Designer the <br /> part or parts which are not acceptable and shall pay the part or parts of the invoice which are acceptable, if <br /> any. This paragraph is not intended to indicate Owner satisfaction of any work or services. No deductions <br /> shall be made from the Designer's fees for basic services except in accordance with this Agreement or to <br /> reimburse the Owner for costs or expenses incurred or anticipated to be incurred for which the Designer is <br /> liable. <br /> 7.3.2 If the Owner increases or decreases the scope of the Project by ten percent(10%)or more of the <br /> currently estimated Total Project Cost,the compensation for Basic Services shall be equitably adjusted. <br /> 7.4 Compensation for Hourly Not-to-Exceed and Additional Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.