Orange County NC Website
DocuSign Envelope ID: D488A4DA-6COC-4F1F-A676-98CFE932E2B5 <br /> FIRE + RESCUE 1 EMS HEADQUARTERS <br /> City of Washington, North Carolina <br /> Co-Located <br /> ha <br /> Fire/Rescue/EMS Station No. 2 for <br /> CONTACT: <br /> Robbie Rose - _ -- the City of Washington was the first <br /> Division Chief ^`:':n�'J �� Capital Improvement project in a <br /> (252) 948-9402 series that was recommended by the <br /> rrose@washingtonnc. - Public Safety Space Analysis Study <br /> gov performed by Stewart-Cooper-Newell <br /> ROLE: __ =_ _ Architects. The city completed this <br /> Architect of Record __ project through funding from USDA <br /> V Rural Development financing. <br /> SCOPE: <br /> Space Needs Study The Substation's design and location <br /> Site Planning allowed the Fire and EMS Departments <br /> Programming + to greatly improve their response times <br /> Concept - to recently annexed areas of the City, <br /> Schematic Design s ;; and thereby helped them maintain their <br /> Construction Doc. <br /> Construction Admin. existing 15O classification. Due to its <br /> coastal location, this facility was also <br /> SIZE: designed to be hurricane resistant. <br /> 11,298 SF <br /> The three-bay facility contains six <br /> DATES: sleep rooms,a dayroom, a kitchen, an <br /> Construction Com- exercise area, a training 1 community <br /> pleted room, and administrative offices. <br /> February 2008 <br /> COST. - <br /> $2.25 million <br /> C S#e a cfter <br /> Ts blewell <br />