Browse
Search
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 10:38:16 AM
Creation date
6/3/2019 9:58:22 AM
Metadata
Fields
Template:
Contract
Date
6/3/2019
Contract Starting Date
6/3/2019
Contract Document Type
Agreement - Services
Agenda Item
5/21/19; 8-d
Amount
$170,280.00
Document Relationships
Agenda 05-21-19 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 05-21-19 Regular Meeting
R 2019-297 AMS - Stewart Cooper Newell Architects ES Efland substation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D488A4DA-6COC-4F1F-A676-98CFE932E2B5 <br /> Question: We are interested in acquiring a copy of the strategic report study mentioned in the RFQ. Is it <br /> available online` <br /> Answer:Check starting on page II of this htto:Ilararraecountync.gov/DCCi'gff Sf1?0830. d <br /> Question: we have concerns regarding the contractual requirements you ask the design teams to accept, and 1 <br /> want to clarify if you actually wish to be as punitive as the requirements currently stipulate: <br /> 21:"the contract requires the"highest professional standards"_..this exceeds all liability insurance coverage for <br /> all professional design firms in the country, as insurance coverage includes only covering a standard of care that r <br /> is"consistent with the professional skill and care ordinarily provided by architects practicing in the same or <br /> similar locality under the same or similar circumstances". <br /> 2.2.1: again,the"highest"generally accepted standard of care exceeds liability coverage limits. <br /> 2.2.2, 2.2.3: no liability insurance covers this level of responsibility,as architects provide instruments of service <br /> —do you really intend that the architect pays all `omitted" items on this project? <br /> 7.3.1: indemnification language is too broad and is non-insurable as well. <br /> 9.3.1: See previous comment on E&Q coverage from 2.2.2 <br /> 10.7.1: given that this is specifically a prototype design, and obviously will be used for multiple projects, this is <br /> unacceptable as written,as we use proprietary specifications,details,etc.that would effectively become your <br /> property and violate our copyright protection,while not alleviating our liability for the documents. <br /> Answer:Each of those sections Is negotiable as is every other contract we have <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.