Browse
Search
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 10:38:16 AM
Creation date
6/3/2019 9:58:22 AM
Metadata
Fields
Template:
Contract
Date
6/3/2019
Contract Starting Date
6/3/2019
Contract Document Type
Agreement - Services
Agenda Item
5/21/19; 8-d
Amount
$170,280.00
Document Relationships
Agenda 05-21-19 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 05-21-19 Regular Meeting
R 2019-297 AMS - Stewart Cooper Newell Architects ES Efland substation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D488A41DA-6COC-41`1 F-A676-98CFE932E2135 <br /> 5 <br /> Exclusions: <br /> - No testing of existing structure is included to determine existing masonry <br /> reinforcement placement. This, if needed, will be provided by the owner. <br /> The design team will assist the owner in acquiring these services. <br /> - No surveying or geotechnical exploration is included; however, the design <br /> team will assist the owner with acquiring these services, if requested. <br /> - The facility will not be LEED certified and therefore no LEED design or <br /> certification services are included. <br /> The civil engineering design is based upon the assumption that due to the size of the <br /> facility and project that no Stormwater Management design or erosion control <br /> permit will be required. With this assumption, the fee includes design of required <br /> erosion control measures for the contractor during construction. As an add alternate <br /> to the fee proposal, if needed, we will include stormwater management design and <br /> calculations for an additional fee as stated below. Similarly, due to the minimal site <br /> work being proposed, it is our hope that landscape improvements beyond re- <br /> grassing will not be required. A fee to add this cost is also stated below. At the <br /> request of the County we are also providing an add fee alternate for providing the <br /> design of a roughly 60 kw roof top photovoltaic system. Lastly, the county has <br /> requested a fee for an add if the county decides to split the project so that it would <br /> be bid as 2 projects. This additional fee is also included below. <br /> Additional add alternate fee items: <br /> 1. Stormwater Management Design $8,000 <br /> 2. Landscape Design 2,000 <br /> 3. Design of roughly 60kw solar sys. 5,200 <br /> 4. Additional Bid Package 16,500 <br /> Our proposed schedule for the project is: <br /> Schematic Design: June3 - July 18 <br /> Design Development: July 19 - Sept 2 <br /> Construction Drawings: Sept 3 - Dec 2 <br /> Permit Review: Dec 3 Jan 3, 2020 <br /> Bidding: Jan 7—Feb 4 <br /> County Approval/ Contracts: Feb 4—Mar 4 <br /> Construction Administration: March—Dec <br /> Closeout/Occupancy: Jan 2021 <br /> We look forward to serving the County on this important project. Please let me <br /> know if you have any questions regarding this proposal or would like any additional <br /> information. <br /> rel <br /> ARCHITECTURE <br /> PLANNING JJa R. Stu bo, AIA, LEED-AP BD+C <br /> INTERIORS <br /> 2 <br /> CONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.