Browse
Search
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 10:38:16 AM
Creation date
6/3/2019 9:58:22 AM
Metadata
Fields
Template:
Contract
Date
6/3/2019
Contract Starting Date
6/3/2019
Contract Document Type
Agreement - Services
Agenda Item
5/21/19; 8-d
Amount
$170,280.00
Document Relationships
Agenda 05-21-19 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 05-21-19 Regular Meeting
R 2019-297 AMS - Stewart Cooper Newell Architects ES Efland substation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D488A4DA-6COC-4F1F-A676-98CFE932E2B5 <br /> ARTICLE 2 <br /> DEFINITIONS <br /> 2.1 Definitions <br /> 2.1.1 Additional Services—Those services to be performed by Designer beyond the Basic Services. See <br /> Section 1.1.4 and Article 5. <br /> 2.1.2 Basic Services—Those services to be performed by Designer as outlined in Attachment B. See <br /> Article 4 and Attachment B. <br /> 2.1.3 Compensation for Basic Services—Those fees to be paid by Owner for Basic Services. See Section <br /> 7.1 and 7.2. <br /> 2.1.4 Contractor—The construction contractor(s). <br /> 2.1.5 Consultants—Subconsultants, partners and other entities working with or on behalf of the <br /> Designer. See Section 3.3.1 and Attachment E. <br /> 2.1.6 Board of County Commissioners-The Board of Commissioners of Orange County, North Carolina. <br /> 2.1.7 County Manager-The Orange County employee bearing that title. <br /> 2.1.8 Milestone Dates—Those dates where certain results are expected. See Attachment D. <br /> 2.1.9 Project-All phases of the Project as described in Section 1.1.1 and Attachments A and B including <br /> but not limited to the schematic design, design development,construction document, bidding and contract <br /> award,construction and post-construction phases. <br /> 2.1.10 Reimbursable Expenses—Those costs incurred by the Designer for the benefit of this project and <br /> which the County will pay. See Section 7.5. <br /> 2.1.11 Total Project Cost—The total amount of money which may be paid for services on this project.See <br /> Section 4.2.1. <br /> ARTICLE 3 <br /> RESPONSIBILITIES OF THE DESIGNER <br /> 3.1 Services to be Provided. <br /> 3.1.1 The Designer shall provide the Owner with all professional services required to satisfactorily <br /> complete all phases of the Project within the time limitations set forth herein and in accordance with the <br /> standard of care.Such services are as shown in Attachment B,the description of services. <br /> All services of the Designer shall be provided in accordance with the terms and conditions of this <br /> Agreement. <br /> 3.2. Standard of Care <br /> 3.2.1 The Designer shall perform its services consistent with the professional skill and care ordinarily <br /> provided by architects practicing in the same or similar locality under the same or similar circumstances. <br /> The Designer shall preform its services as expeditiously as is consistent with such professional skill and care <br /> and the orderly progress of the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.