Browse
Search
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-297-E AMS - Stewart Cooper Newell Architects ES Efland substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 10:38:16 AM
Creation date
6/3/2019 9:58:22 AM
Metadata
Fields
Template:
Contract
Date
6/3/2019
Contract Starting Date
6/3/2019
Contract Document Type
Agreement - Services
Agenda Item
5/21/19; 8-d
Amount
$170,280.00
Document Relationships
Agenda 05-21-19 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 05-21-19 Regular Meeting
R 2019-297 AMS - Stewart Cooper Newell Architects ES Efland substation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D488A4DA-6COC-4F1F-A676-98CFE932E2B5 <br /> Attachment A—Description of the Project <br /> The County has purchased a roughly 4260 square foot load bearing masonry building at 3800 Hwy 70, <br /> Efland, NC with the intentions of renovating this into a new EMS facility.There are no planned additions. <br /> The current plan is that the building structural system will be updated and revised to bring the renovated <br /> building up to current structural code requirements for an Essential facility.As part of this proposal,we <br /> have included costs from our structural engineer for analysis of the existing structural systems and design (if <br /> possible)of additional structural support systems to bring the existing structure into compliance, prior to <br /> proceeding.After the initial analysis is complete, we will review with the owner to see if bringing the <br /> current structure up to code is feasible and cost effective. <br />
The URL can be used to link to this page
Your browser does not support the video tag.