Browse
Search
Agenda 06-04-2019 6-a - Major Subdivision Preliminary Plat Application – Fairway Hills
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 06-04-19 Regular Meeting
>
Agenda 06-04-2019 6-a - Major Subdivision Preliminary Plat Application – Fairway Hills
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 2:56:32 PM
Creation date
5/30/2019 2:53:52 PM
Metadata
Fields
Template:
BOCC
Date
6/4/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda - 06-04-2019 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 06-04-19 Regular Meeting
Minutes 06-04-19 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
RES-2019-033 Resolution of approval for the Fairway Hills preliminary plat
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
92 <br /> US 70 anticipating unrelated to this project a NCDOT right of way, road improvements that would theoretically require <br /> five feet of additional right of way. The planning director recommends that the Planning Board receive the <br /> Preliminary Plat application,discuss the proposal as desired and then recommend approval of the plat. The way this <br /> process would work is you would make a recommendation either way. You would consider the case or continue the <br /> case. Ultimately, it would have to go to the Board of Commissioners for a final determination, and they would make a <br /> vote on the major subdivision. After that,there many other steps, certifications, permits that have to be obtained;well <br /> permits, septic permits, road construction,coordinating with DOT, and the right of way has to be dedicated and <br /> accepted by DOT. There would be a storm water permit, a land disturbance permit. It would be reviewed and <br /> approved in terms of erosion control and water quantity, and water quality. As part the project, all of those things <br /> would basically have to occur prior to the reggeridation of the lots. <br /> Adam Beeman: Can you just give me a reference as to where the existing driveway is;to where Birdie Lane is? Are <br /> they on top of each other? <br /> Patrick Mallett: They actually moved. The existing driveway,there's an area where they are proposing to plug in that <br /> existing hole with some evergreen trees and shrubs. This public road is further north and west. The reason being is <br /> both the applicant and NC DOT wanted to avoid this box culvert. <br /> Adam Beeman: Is that just short of that grade change that you were showing in the pictures? <br /> Patrick Mallett: That's roughly in that general area, but I think they've spent a significant amount of time trying to <br /> properly locate where that road should go in terms of site distance,with minimal disturbance to the existing right of <br /> way and meeting with NC DOT standards for the roads. I think that also involved discussions and meetings with <br /> Chuck Edwards the NC DOT engineer. <br /> Tim Smith: Looking at the site again,you can see it highlighted here. It is adjacent to across the street off Highway <br /> 70 from the golf course and it's in between Palmer's Grove Church Road and Lawrence Road on the north side of <br /> Highway 70. Highlighted in red on the exhibit you will see the surrounding area and what's there now. There's <br /> several very similar developments in the area. One acre, plus or minus, lots that are on well and septic up along <br /> Palmar Grove Church Road. There's several little pockets of subdivisions that have one acre lots with well and <br /> septic. Off of Lawrence Road there is also a woodland trailer park that has 23 trailer sites on that property,and that's <br /> served by well and septic although they do have a community well for that site. Back in February of this year,we had <br /> neighborhood information meeting for the public to come. This shows the limits of the notification of a thousand feet <br /> around the property. Those property owners were notified of the development and were sent letters to the <br /> neighborhood meeting. We met and discussed and heard their concerns and so forth, and their comments. We've <br /> taken all those into consideration as we've continued to adjust and work with the layout and the proposal for the <br /> subdivision. As Pat mentioned,the existing conditions of the site and showed you some pictures along the frontage <br /> the property. Patrick also went over most of the site data for the property,the zoning, the density, all those numbers <br /> are the same here. We are proposing about 2,300 linear feet of roads for the two cul-de-sac roads including the <br /> entrance coming up off Highway 70, and we are at 17 percent impervious proposed right now. That's for the road <br /> construction and the proposed houses an estimate of what would be on each lot. Out on Highway 70 as we <br /> mentioned,there is a 75-foot type E buffer required out there. It is rural, but we're proposing to add additional <br /> plantings along highway 70 to increase the opprosity of that buffer to give more screening for that area that will <br /> include the area where the existing driveway is now. As Pat mentioned,we are proposed well sites on each lot. We <br /> have laid out a potential well site for each lot that meets the setback requirements for the property lines per the code <br /> with Orange County environmental health. Again,the shaded areas with the hatching lines is where we're identified <br /> some suitable Soils for the property. <br /> Hunter Spitzer:Are wells permitted within the Type E buffer? <br /> Tim Smith: They are not permitted within the Type E buffer. We are showing some that are right on the line, but <br /> they're not propose to be in the type E buffer. <br /> Tim Smith: Back on Highway 70, per our conversation back and forth with NCDOT regarding what they want to <br /> require for this entrance off Highway 70,we are showing a symmetrical widening of Highway 70 as you're headed <br />
The URL can be used to link to this page
Your browser does not support the video tag.