Orange County NC Website
108 <br /> 3. Drainage culverts shall be sized and located appropriately, as required by <br /> Orange County. <br /> G. Emergency Services <br /> 1. The developer shall continue work between property owners, NCDOT and <br /> the Orange County Fire Marshal to ensure that adequate <br /> access/maintenance of fire water source(s) and suppression devices (e.g. <br /> fire hydrants) has been obtained. <br /> H. Parkland <br /> 1. At the time of recordation of the Final Plat, the applicant shall pay to <br /> Orange County $8,645.00 ($455.00 times 20 lots with credit for one <br /> existing lot/residence given) payment-in-lieu-of-parkland dedication fee. <br /> I. Construction Waste <br /> 1. Per Orange County Ordinance, clean wood waste, scrap metal and <br /> corrugated cardboard and all present construction waste, must be <br /> recycled. <br /> 2. Per Orange County Ordinance, all haulers of construction waste must be <br /> properly licensed. <br /> 3. Prior to any demolition or construction activity on the site the applicant <br /> shall hold a pre-demolition/pre-construction conference with the County's <br /> Solid Waste staff. This may be the same meeting held with other <br /> development officials. <br /> J. Miscellaneous <br /> 1. The Final Plat shall contain a title block and vicinity map in accordance <br /> with the UDO. <br /> 2. The open space shall be conveyed into the Homeowner's Association <br /> before Planning Department signatures are affixed to the final plat. <br /> 3. If street lighting is proposed, then a lighting plan shall be submitted to the <br /> Planning Department for review and approval prior to purchase of lighting <br /> fixtures from the utility provider. <br /> Any lighting shall meet the Outdoor Lighting Standards as set forth in the <br /> UDO. <br /> 4. Methods of disposal of trees, limbs, stumps and construction debris <br /> associated with construction activity shall be by some method other than <br /> open burning as required in the UDO. <br />