Orange County NC Website
107 <br /> 5. The Owner/Applicant shall submit a copy of the NC DOT-approved permit <br /> and NC DOT approval letter to the Planning Department prior to, or at the <br /> same time as, the request for a grading permit is made, or before <br /> Planning Department signatures are affixed on the Final Plat, whichever is <br /> first. <br /> 6. Sight triangles (10' x 70') shall be shown on the Final Plat at the <br /> intersection with each of the aforementioned roadways and US Highway <br /> 70 East. <br /> E. Land Use Buffers and Landscaping <br /> 1. The 75-foot wide "Type E" land use buffer along US Highway 70 East, as <br /> identified on the approved Preliminary Plat. These buffers shall be <br /> maintained and/or preserved in perpetuity in accordance with the <br /> provisions of Section 6.8 of the UDO. Existing vegetation credited toward <br /> the required buffer rates shall be inspected by Planning Staff prior to <br /> recordation of the Final Plat/ <br /> 2. Trees within the tree protection area(s) denoted on the approved <br /> Preliminary Plat shall be preserved as proposed by the applicant. <br /> 3. Provisions for the protection of existing trees shall be included in the Final <br /> Plat, as well as the recorded Declaration of Restrictions as prepared by <br /> the Orange County Planning Department. <br /> 4. Clear cutting or other removal of any trees or other vegetation on <br /> individual lots is prohibited as specified within the UDO. This requirement <br /> shall be further evidenced within the subdivision's recorded Declaration of <br /> Restrictions and the Final Plat. <br /> 5. The Landscape Plan shall detail required tree plantings along common <br /> property lines for each of the 20 proposed lots. Development of each <br /> individual lot shall necessitate the submittal of a landscape plan providing <br /> documentation on the installation and/or preservation of existing <br /> vegetation to comply with established landscaping requirements detailed <br /> within the UDO. <br /> 6. The stream buffer areas denoted on the approved Preliminary Plat shall <br /> be left in an undisturbed, natural state with the exception of approved <br /> utilities, pedestrian bridge(s) and accompanying pedestrian pathway(s) <br /> installed consistent with the parameters of the UDO. <br /> F. Drainage <br /> 1. The applicant shall finalize its approved stormwater management and <br /> erosion control permits. <br /> 2. Drainage easements shall be located on the Final Plat as required <br /> following review and approval of the stormwater management plan by <br /> Erosion Control staff. <br />