Orange County NC Website
2 <br /> EC-5. EC-5 is the general use zoning designation specifically crafted to capture "grandfathered" <br /> non-residential uses in existence prior to the adoption of zoning in each township. In this case, <br /> Bingham Township (including this property) was originally zoned in 1981. <br /> The property has been used as a self-storage facility, wood working shop, and residence since <br /> approximately 1977. Current zoning designations split the existing non-residential land uses <br /> into separate districts (i.e. portions are located within both the EC-5 and RB general use zoning <br /> designations). For more information on current conditions, please refer to maps contained <br /> within Attachments 2 and 3. <br /> When staff initiated zoning atlas amendments in 2016, the property owner requested this <br /> property not be considered to allow additional opportunity to review impacts. Since that time, <br /> the property owner has elected to submit the required zoning atlas amendment application <br /> seeking to proceed with a rezoning of the property, eliminating the existing split zoning and zone <br /> the entire parcel EC-5, consistent with staff's original proposal in 2016. <br /> It is unclear why the original zoning effort undertaken in the Bingham Township, which occurred <br /> in 1981, failed to capture the various non-residential land uses that were in existence on the <br /> property. This request, however, will address this matter by rezoning the property entirely to <br /> EC-5. <br /> Development Process, Schedule, and Action: The typical cadence for the review of a General <br /> Use Rezoning and Zoning Atlas amendment is: <br /> • FIRST ACTION — Submission of a General Rezoning application with required <br /> supporting documents by the property owner. <br /> STAFF COMMENT: Mr. Stan Lawton, the property and business owner, submitted <br /> the required materials on February 4, 2019. Staff determined the application to be <br /> complete on February 27, 2019. <br /> • SECOND ACTION — The Planning Board receives the application and staff <br /> prepared materials and makes a recommendation on the Rezoning request. <br /> STAFF COMMENT: Staff presented this request and the Planning Board made a <br /> unanimous recommendation to approve the request at its May 1, 2019 regular <br /> meeting. <br /> • THIRD ACTION — The BOCC holds a public hearing on the request; receives the <br /> application materials and recommendations, and takes action on the request. <br /> STAFF COMMENT. Staff will present these materials and facilitate the public <br /> hearing at the BOCC's June 4, 2019 regular meeting. <br /> Site specific information on the property, and request, is as follows: <br /> Township: PIN: Owner: Existing Zoning: Request: <br /> Bingham 9758-42-4098 Thomas Lawton Rural Buffer (RB) (2.65 Expand the existing EC-5 <br /> 2616 Old acres)AND zoning designation to the <br /> Greensboro Existing Commercial (EC-5) entire parcel (4.08 acres) <br /> Chapel Hill, NC (1.43 acres) ensuring all structures <br /> 27516 associated with operation <br /> University Lake Protected are located within the <br /> Watershed Overlay District appropriate district. <br />