Browse
Search
Agenda 8-e - Schools Adequate Public Facilities Ordinance – Approval and Certification of 2019 Report
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 06-04-19
>
Agenda 8-e - Schools Adequate Public Facilities Ordinance – Approval and Certification of 2019 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 2:43:15 PM
Creation date
5/30/2019 2:05:18 PM
Metadata
Fields
Template:
BOCC
Date
6/4/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda - 06-04-2019 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 06-04-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> Future Residential Development <br /> Following the economic downturn, there has been an increase in approved and undeveloped <br /> residential projects in Orange County. Currently, there are over four thousand proposed single <br /> family and multifamily housing units approved, but undeveloped in the CHCCS district. In <br /> addition, there are over a thousand proposed residential units approved,but undeveloped in the <br /> OCS district. Proposed growth is not included in the SAPFO projection system until actual <br /> students begin enrollment. The Certificate of Adequate Public Schools (CAPS) test is conducted <br /> during the approval process at a certain stage. Once students are enrolled in a school year, <br /> through annual reporting of student membership numbers, 10-year student projections can be <br /> updated to display future capacity needs in time to efficiently plan for future school construction <br /> requests. Staff and the SAPFO Technical Advisory Committee continue to monitor and evaluate <br /> the demand and growth of residential development throughout Orange County as well as its <br /> effect on student membership rates. <br /> Below is a list of larger residential projects and the potential number of students from these <br /> projects which may have impact to the schools in the short term. Please note, a CAPS has not <br /> been issued for The Meadows or Villas at Havenstone due to their location in the City of <br /> Mebane. The City of Mebane is not a party to the SAPFO agreement and therefore does not <br /> require that CAPS (Certificate of Adequate Public Schools)be issued prior to development <br /> approvals. As a result, the potential number of students is based on unit type and bedroom count <br /> estimates. <br /> Residential Project Jurisdiction Proposed T <br /> Students <br /> Elementary: 84 <br /> Collins Ridge Phase 1 Hillsborough 672 Middle: 45 <br /> High: 57 <br /> Elementary: 28 <br /> Carraway Village Chapel Hill 400 Middle: 10 <br /> High: 14 <br /> Elementary: 60 <br /> The Meadows Mebane 256 Middle: 31 <br /> High: 34 <br /> Elementary: 4 <br /> Villas at Havenstone Mebane 68 Middle: 3 <br /> High: 4 <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.