Browse
Search
OUTBoard agenda 051519
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 051519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:55:59 AM
Creation date
5/28/2019 12:11:04 PM
Metadata
Fields
Template:
BOCC
Date
5/15/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPMENT Technical <br /> TIPNNBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1- 1/16/2024 FY 2027 $49,751,000 Planning and Design activities Laura Sutton <br /> 50235.1.1 40 to Eno River in Hillsborough underway, Coordinate with U-5848 <br /> 50235.2.1 and 1-5967 <br /> 50235.3.1 <br /> 1-5984 Interchange improvements at 1-85 and NC 86 in 11/18/2025 FY 2027 $16,488,000 Funding approved 10/10/17, Laura Sutton <br /> 47530.1.1 Hillsborough Coordinate with 1-0305 and 1-5959 <br /> 47530.2.1 <br /> 47530.3.1 <br /> U-6071 Intersection improvements at NC 54 and SR 1007 (Old 1/15/2026 FY 2027 $1,216,000 Planning and design activities Jennifer Evans <br /> 47496.1.1 Fayetteville Rd)in Carrboro underway, Project on hold per Draft <br /> 47496.2.1 2020-2029 STIP (unfunded project) <br /> 47496.3.1 <br /> 1-5983 Widen 1-85 in Orange Co.from west of SR1713 (Mt. 10/20/2026 FY2029 $53,460,000 Planning and Design activities Laura Sutton <br /> 47529.1.1 Hermon Church Rd)to Durham Co. line underway, Coordinate with U-5848, <br /> 47529.2.1 1-0305 and 1-5984 <br /> 47529.3.1 <br /> 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove 1/1/2027 FY2029 $133,400,000 Planning and design activities Laura Sutton <br /> 34142.1.2 Road)in Orange Co.to west of SR 1400 (Sparger Road) in underway, Project reinstated per <br /> 34142.2.2 Orange Co. Draft 2020-2029 STIP (funded <br /> 34142.3.2 1 1 1 project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.