Orange County NC Website
Item 7.b. <br /> bb <br /> NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPM�T'°a' <br /> TIPNNBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-4907BS Installation of traffic signal at the intersection of US70 and 5/31/2017 Apr. 2019 $40,500 R/W Utility relocations complete, Right of Dawn McPherson <br /> 44894.2.1 SR 1114 (Buckhorn Road)East of Mebane. $43,200 CON entry rescinded, R/W acquisition <br /> 44894.3.1 pending <br /> W-5707C Revise pavement markings and overhead lane use signs for 11/1/2018 Aug. 2019 $395,000 Planning and design activities Chad Reimakoski <br /> 44853.1.3 removal of inside lane drop configuration on 1-40 underway, re-let due to bids <br /> 44853.3.3 Westbound in vicinity of US 15-501 interchange. exceeded engineers estimate, new <br /> 47490 Resurfacing 1-40 WB by use of contingency funds let date 11/1/18 and received no <br /> bids, possible delivery by design- <br /> build let <br /> 47798 Increase length of existing turn lane/slip ramp and 1/17/2019 Jul. 2019 $189,000 Planning and design activities Derek Dixon <br /> improve existing radius in the SE quadrant of US 70 complete, R/W certified 9/18/18, <br /> Business/NC 86 at US 70 Bypass in Hillsborough signal work complete,widening <br /> scheduled by end of Mar. 2019 <br /> U-5846 Construct a roundabout at SR 1772 (Greensboro Street) Mar. 2019 FY2021 $775,000 1st bid opening received no bids, Chad Reimakoski <br /> 50236.1.1 and SR 1780(Estes Drive)in Carrboro. Re-let 9/6/18 bids exceeded <br /> 50236.2.1 engineers estimate, project cost <br /> 50236.3.1 evaluation being performed, Utility <br /> relocation underway, Re-let pending <br /> B-4962 Replace Bridge#46 over Eno river on US 70 Bypass 4/16/2019 FY 2021 $5,826,000 Planning and Design activities Kevin Fischer <br /> 40174.1.1 underway, ROW acquisition <br /> 40174.2.1 complete, ROW certified 1/22/19 <br /> 40174.3.1 <br /> W-5707K Remove and replace existing curb&gutter and sidewalk, 5/31/2019 Sept. 2019 $350,000 Construction May 2019 Chris Smitherman <br /> 48283 add pedestrian signals, concrete island, and signal Derek Dixon <br /> modifications on SR 1010(E. Main St/W. Franklin St)from <br /> Brewer Ln to Graham St. in Chapel Hill and Carrboro <br /> U-5847 Intersection improvements at SR 1010 (West Franklin St.) 5/31/2019 Sept. 2019 $775,000 Planning and design activities Chris Smitherman <br /> 50238.1.1 and SR 1771 (Merritt Mill Rd)/SR1927 (Brewer Lane)in underway, bike/ped improvements <br /> 50238.2.1 Chapel Hill/Carrboro. to be completed under project <br /> 50238.3.1 48283 <br /> Page 1 DCHCMPO Feb.2019.xlsx <br /> Page 13 of 17 <br />