Browse
Search
Planning Board agenda 050119
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2019
>
Planning Board agenda 050119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 12:14:19 PM
Creation date
5/28/2019 11:46:45 AM
Metadata
Fields
Template:
BOCC
Date
5/1/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> DRAFT <br /> 52 AGENDA ITEM 6: PUBLIC CHARGE <br /> 53 Chair Lydia Wegman read the Public Charge <br /> 54 <br /> 55 AGENDA ITEM 7: CHAIR COMMENTS <br /> 56 There were none <br /> 57 <br /> 58 AGENDA ITEM 8: MAJOR SUBDIVISION CONCEPT PLAN REVIEW-To review and take action on a Concept Plan <br /> 59 application for a Major Subdivision called Fairway Hills. The proposal is for a 20 lot single-family Flexible <br /> 60 Development subdivision on 41.97 acres(PINs 9884-32-3275 and 9884-31-9874) located in Eno Township on the <br /> 61 north side of US Highway 70 across from Occoneechee Golf Club. <br /> 62 PRESENTER: Patrick Mallett, Planner II <br /> 63 <br /> 64 Patrick Mallett reviewed the case history and changes since the original application,presented a PowerPoint <br /> 65 presentation and reviewed the abstract including attachments. <br /> 66 <br /> 67 The project, originally proposed as a 27 lot Class A Special Use Permit Major Subdivision project, had been revised <br /> 68 by the applicant. Now, Fairway Hills is proposed to be a 20 lot Flexible Development Cluster Major Subdivision. As <br /> 69 a result, the review of the project would follow standards established within Section 2.15 of the UDO rather than the <br /> 70 Special Use Permit process as contained in Section 2.7. Further, the applicant was no longer required to abide by <br /> 71 standards contained in Section 5.17.6 of the Unified Development Ordinance as the project is no longer classified as <br /> 72 requiring a Special Use Permit. The applicant was still obligated, however, to demonstrate compliance with the <br /> 73 provisions of Article 7 of the UDO, which establishes the development standards for subdivision projects. <br /> 74 <br /> 75 The proposal will still involve creation of individual single-family residential lots for future development,proposed to <br /> 76 be served by roadways constructed to applicable NC Department of Transportation guidelines. The proposed lots <br /> 77 range in size from 42,785 square feet(smallest)to 125,765 square feet(largest). The Gross density is one dwelling <br /> 78 unit per 2.1 acres, which is consistent with applicable Comprehensive Plan land use designations and the Lower Eno <br /> 79 Protected Watershed Protection Overlay district. The applicant was proposing the creation of approximately 37%of <br /> 80 open space area, which will be managed by a local homeowners association. <br /> 81 <br /> 82 The applicant is proposing to serve the project with individual wells and for septic systems developed on each lot. <br /> 83 The Concept Plan denotes anticipated areas for septic sites. The applicant has also conducted more detailed well <br /> 84 and septic analysis and submitted documents as part of their application. <br /> 85 <br /> 86 Overall drainage will be engineered according to applicable standards at the time of permit application for <br /> 87 construction. The property is subject to adopted erosion control and stormwater management guidelines. The <br /> 88 Concept Plan currently anticipates improving drainage using mostly Common Open Space Areas. <br /> 89 <br /> 90 The Concept Plan denotes a 75 foot wide Type E natural/constructed landscape buffer along US Highway 70 East. <br /> 91 This area will be planted with additional materials and landscaped(e.g. berms/fencing) to augment preserved <br /> 92 existing vegetation. The 75 foot buffer will meet the required Type E Buffer, as outlined in Section 6.8.6(F)of the <br /> 93 UDO. The applicant has proposed a 50 foot perimeter well and septic setback and a 100 foot building setback, which <br /> 94 would limit structures, clearing and utilities along the perimeter and US Highway 70 East. <br /> 95 <br /> 96 Tim Smith of Summit Engineering presented a PowerPoint presentation and provided additional project details. <br /> 97 <br /> 98 Lydia Wegman asked Tim about the additional set-backs and about the wells and septic. <br /> 99 <br /> 100 Tim Smith confirmed that the building set-backs on US 70 would be 125 feet and 50 feet for well and septic. He also <br /> 101 advised that they have hired a consultant for the express purpose of studying the water and septic requirements <br /> 102 needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.