Browse
Search
2019-285-E Solid Waste - Hammerstruck LLC SWCC building repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-285-E Solid Waste - Hammerstruck LLC SWCC building repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:51:02 AM
Creation date
5/24/2019 10:05:47 AM
Metadata
Fields
Template:
Contract
Date
5/20/2019
Contract Starting Date
5/20/2019
Contract Ending Date
7/30/2019
Contract Document Type
Agreement - Construction
Amount
$10,068.00
Document Relationships
R 2019-285 Solid Waste - Hammerstruck LLC SWCC building repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:9BA16521-54C1\4D78-BE61-99EECC43994D <br /> 1 <br /> H�ME — TRUCKG <br /> (S I9) 694-1 001 <br /> Attachment 2 <br /> Bid Proposal <br /> Owner Information Contractor Information <br /> Orange County Solid Waste Management HammerStruck LLC <br /> 6705 Bradshaw Quarry Rd Garrett Paschall: License#80246 <br /> Mebane, NC 27302 <br /> 919-968-2788 <br /> Project Name: Break Room Fix Up <br /> Scope <br /> The first step will be removing the existing shingles, rigid vents, tar paper and gutters. Once the <br /> roof is completely stripped the sheathing that needs to be replaced will be done at this time. <br /> Once the sheathing is nailed down and properly secured the old facial boards will be removed <br /> and new facial boards will be installed. Once the new facial boards are installed the new roofing <br /> felt will be applied. The drip edge will be installed next. The new roll starter strip will be <br /> installed with a 3/ inch hangover to give the roof rake a clean look and added protection to the <br /> shingle edges. The new dimensional shingles will be installed with the manufactories suggested <br /> nail pattern. Once the roof is shingled the last thing added will be the ridge vents and roof caps. <br /> The two sheets of siding that need to be replaced will be removed and the new siding will be <br /> installed. The ac unit will be removed and the old trim will be removed. The new trim will be <br /> installed and the ac unit will be re installed. The trim around the window will be removed and <br /> the new trim will be installed. The one corner board that is rotten will be removed and the new <br /> corner board will be installed. Once all the rotten boards are replaced the building will be <br /> thoroughly pressure washed. Once the building is cleaned it will be prepped for painting the <br /> building will be caulked where needed. The paint provided will be applied to the building. Once <br /> all the painting is done and dry the new gutters will be installed on the two sides. The scrape <br /> material will be disposed of on site. <br /> Material <br /> Description Quantity <br /> Dimensional shingles 8 bundles <br /> Roof felt 1/3 roll <br /> Drip edge 6 10 sticks <br /> Starter strip 2 rolls <br /> T111 siding 2 sheets <br /> 1x6 corner board 1 <br /> 1x6 facial board 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.