Browse
Search
2019-285-E Solid Waste - Hammerstruck LLC SWCC building repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-285-E Solid Waste - Hammerstruck LLC SWCC building repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:51:02 AM
Creation date
5/24/2019 10:05:47 AM
Metadata
Fields
Template:
Contract
Date
5/20/2019
Contract Starting Date
5/20/2019
Contract Ending Date
7/30/2019
Contract Document Type
Agreement - Construction
Amount
$10,068.00
Document Relationships
R 2019-285 Solid Waste - Hammerstruck LLC SWCC building repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:9BA16521-54C1\4D78-BE61-99EECC43994D <br /> 1 <br /> H�ME — TRUCKG <br /> (S I9) 694-1 001 <br /> Attachment 1 <br /> Bid Proposal <br /> Owner Information Contractor Information <br /> Orange County Solid Waste Management HammerStruck LLC <br /> 7001 High Rock Rd Garrett Paschall: License#80246 <br /> Efland, NC 27243 <br /> 919-968-2788 <br /> Project Name: Break Room Fix Up <br /> Scope <br /> The first step will be removing the existing shingles, rigid vents, tar paper and gutters. Once the <br /> roof is completely stripped the sheathing that needs to be replaced will be done at this time. <br /> Once the sheathing is nailed down and properly secured the old damaged facial boards will be <br /> removed. Once the new facial boards and installed the new roofing felt will be applied. The drip <br /> edge will be installed next. The new roll starter strip will be installed with a % inch hangover to <br /> give the roof rake a clean look and added protection to the shingle edges. The new dimensional <br /> shingles will be installed with the manufactories suggested nail pattern. Once the roof is <br /> shingled the last thing added will be the ridge vents and roof caps. The ac unit will be removed <br /> at this stage. The rotten trim and siding will be removed. Security cameras and other electrical <br /> items will be removed and reinstalled. The damaged wall will then be fixed. Any broke studs will <br /> be cut out and want needs to be re framed will be done. The siding will then be reinstalled <br /> followed by the window and ac unit trim. The ac unit will then be re installed. The one corner <br /> board that is rotten will be removed and reinstalled. The building will be prepped for pressure <br /> washing. Once the building has been pressure washed the building will be prepped for painting. <br /> Any areas that need to be caulked will be. Once the building is painted and dry the new gutters <br /> will be added to the front and rear. All waste will be disposed of on site. <br /> Material <br /> Description Quantity <br /> Dimensional shingles 8 bundles <br /> Roof felt 1/3 roll <br /> Drip edge 6 10ft sticks <br /> Starter strip 2 rolls <br /> T111 siding 3 sheets <br /> 1x6 Facial boards 5 <br /> 1x6 corner board 1 <br /> Trim boards 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.